Looking for Plagiarism free Answers for your college/ university Assignments.
During the refurbishment of a petrochemical plant, it is required to re-tune and redesign the controllers of problematic parts of the plant. It has been verified that the dynamic process to be controlled mainly consists of a plant dynamic and an actuator dynamic as shown in Figure 1 below. The input/output relation of the actuator dynamic: w