Question 1
Discuss why the contract sum in a particular construction project must be continually updated during the contract period.
Question 2
The following Instructions (a), (b), (c) and (d) are given by a contract administrator during a contract period. Based on the SIA Lump Sum contract and the cost information given in the table, apply the rules of variation and calculate the variation costs. Page No Description Unit Rate B3/23/B 20 mm thick cement and sand (1:3) paving trowelled smooth. B3/45/A 16 mm thick ‘Celetone’ mineral fibre board suspended ceiling. B3/48/C 900 x 2100 x 45 mm thick single leaf half-hour fire-rated door. m2 $13.00 m2 $ 25.00 No $7.80
(a) Increase the thickness of the cement and sand paving in item B3/23/B to 25 mm thick. 2 The cement and sand paving area is 125 m .
(b) Supply and install 16mm thick ‘Celetone’ mineral fibre board suspended ceiling to two additional meeting rooms. The quantity of item B3/45/A is increased from 22 1248 m to 1425 m
. (c) Supply and install a half-hour fire-rated door to the 2nd storey conference room. The quantity for item B3/48/C is increased from 10 Nos. to 11 Nos. The contractor has mistakenly priced the unit rate for this item at $7.80 instead of $780 per door. The contractor wishes to claim for a correction to this rate.
(d) Supply and fix wrot teak architrave (not shown in the contract documents) to all timber flush doors. Question 3 (40 marks) A well-known University intends to engage a contractor to build a $100 million facility within its campus.
You are required to provide sound professional advice to the Dean of the University. Assume the Public Sector Standard Conditions of Contract 2020 is used for the contract, explain the payment procedure from the commencement of the contract to the issue of the Final Certificate.
Buy Custom Answer of This Assessment & Raise Your Grades
Are you facing difficulty in BPM109: Contract Administration and want someone to give my assignment help then you have come to the right place. At Singapore Assignment Help we have a group of suss assignment writers who provide you impeccable help in business administration assignments at a low-cost price.
Looking for Plagiarism free Answers for your college/ university Assignments.
- PS300 Research Project Assignment: Emotional Intelligence Components Predict Happiness
- Electronics Engineering Circuit Assignment Questions: Theory & AC Analysis
- EAS425 Tutor-Marked Assignment Report: Arrow Airways Case in Flight Line Management
- Community Health Nurses in Singapore Assignment: Balancing Prevention and Treatment in Diabetes Management
- ACC08702 Flexible Budgeting Analysis with Variance Calculation: Selling Overheads & Consultancy Services Case Study
- GCE A-Level 8882 Project Work: How to Write a Winning Project Summary
- IT3662 SAFENET Network Security and Integration Assignment: Case Study on HQ and Branch Office Setup
- Vodafone Group Plc Annual Report Assignment: Financial Performance and Shareholder Insights (2024)
- Financial Literacy Lifespan Assignment: A Case Study on Gen Z & Millennials’ Financial Stability and Lifelong Learning
- PSB7008CL Organisational Behaviour Assignment: Case Study on Leadership, Diversity, and Change Initiatives