University | Nanyang Technological University (NTU) |
Subject | CV6213:Construction Technology |
Group Project Assignment
Select a completed/current tall building or bridge project for study/evaluation:
I. Review the various aspects of the construction technology previously / currently adopted, not limiting to the following:
1) Choice of structural material and the system
2) Method of construction (permanent and temporary works)
3) Construction plant/equipment planning
4) Various authorities’ requirements and approvals with respect to project planning, design, and construction requirements
E.g. the authorities; URA /BCA /MOM /PUB /NEA /LTA /SCDF /NParks /CAAS 5) Any others
II. Suggest improvement of the construction method in the areas of productivity/ quality/safety/time /cost /sustainability enhancement for SMART construction;
a) DFMA – (PPVC-Prefabricated Prefinished Volumetric Construction)
b) IDD SMART technology adoption – BIM/VDC, AR/VR, robotic, drone, AI, IoT, mobile collaboration, 3D printing, RFID, 3D scanning, etc
c) Advanced construction material
d) SG green plan – reduce carbon emission, circular economy
III. Identify the current practical issues faced by civil/structural design engineers in adopting BIM (3D) and quantity surveyor /project manager/ builder when implementing BIM (4D/5D).
IV. Suggest solution(s) to smoothen the application of BIM (3D, 4D, 5D) and adoption of AI to perfect the BIM implementation.
Buy Custom Answer of This Assessment & Raise Your Grades
Take top-notch report writing help on CV6213:Construction Technology from the qualified report writers of Singapore Assignment Help. We have dedicated Report writers from different disciplines who compose flawless reports on civil engineering assignments at an affordable price.
Looking for Plagiarism free Answers for your college/ university Assignments.
- EA301MAA Airline Route and Fleet Planning Individual Assignment Fall Semester 2025-26
- BME356 Functional Genomics Tutor-Marked Assignment July 2025 Presentation
- BUS105 Statistics Assignment: Inferential Analysis of Customer Satisfaction Scores Between Total Sensing Corporation and Building Sensing Enterprise
- ICT 133 Structured Programming Tutor-Marked Assignment July 2025 Presentation
- BUS354 Customer Relationship Management Group-based Assignment July 2025 Semester
- LOG351 Lean Six Sigma for Supply Chains Group-based Assignment July 2025 Semester
- 7009CL Global Strategic Management Assignment Coursework brief
- PSYC 326 Design and Analysis Assignment Report 2
- 600EN Embedded Systems Engineering Coursework Assignment 1
- HR9516 HRM Essentials Assignment – Well-Being at IMH and Personal Reflection with Nestlé