University | Nanyang Technological University (NTU) |
Subject | CV6213:Construction Technology |
Group Project Assignment
Select a completed/current tall building or bridge project for study/evaluation:
I. Review the various aspects of the construction technology previously / currently adopted, not limiting to the following:
1) Choice of structural material and the system
2) Method of construction (permanent and temporary works)
3) Construction plant/equipment planning
4) Various authorities’ requirements and approvals with respect to project planning, design, and construction requirements
E.g. the authorities; URA /BCA /MOM /PUB /NEA /LTA /SCDF /NParks /CAAS 5) Any others
II. Suggest improvement of the construction method in the areas of productivity/ quality/safety/time /cost /sustainability enhancement for SMART construction;
a) DFMA – (PPVC-Prefabricated Prefinished Volumetric Construction)
b) IDD SMART technology adoption – BIM/VDC, AR/VR, robotic, drone, AI, IoT, mobile collaboration, 3D printing, RFID, 3D scanning, etc
c) Advanced construction material
d) SG green plan – reduce carbon emission, circular economy
III. Identify the current practical issues faced by civil/structural design engineers in adopting BIM (3D) and quantity surveyor /project manager/ builder when implementing BIM (4D/5D).
IV. Suggest solution(s) to smoothen the application of BIM (3D, 4D, 5D) and adoption of AI to perfect the BIM implementation.
Buy Custom Answer of This Assessment & Raise Your Grades
Take top-notch report writing help on CV6213:Construction Technology from the qualified report writers of Singapore Assignment Help. We have dedicated Report writers from different disciplines who compose flawless reports on civil engineering assignments at an affordable price.
Looking for Plagiarism free Answers for your college/ university Assignments.
- A2429C Case Study Assignment: Glucose Homeostasis, Muscle Function, and Cardiovascular-Lymphatic Disorders
- Finance/ Wealth Management Assignment: Broker Report on Equity and Bond Valuation for Global Listed Companies
- PSB503IT Team Project Reflective Report Assignment: Enhancing Collaboration and Professional Development
- Microbiology Assignment: The Role of Medical Microbiologists in Disease Control and Their Contribution to Public Health
- A2389C Pharmaceutical Supply Chain Case Study Assignment: Emergency Preparedness Plan for Tariff Impact in Singapore
- Mobile Learning App Evaluation Report Assignment: Usability, Design, and Learning Outcome Analysis
- CTA Psychotherapy Intervention Essay Assignment: Sheila Case Study on Managing Anxiety and Marital Stress
- DSM500 Machine Learning Project Proposal: Retail Sales Forecasting with Time Series Models
- Project Management Assignment 2: The Shard UK Case Study on Risk & Stakeholder Strategies in Construction Projects
- CSIT121 Banking Application Assignment: OOP-Based Customer & Account Management System in Python