| University | Singapore University of Social Science (SUSS) |
| Subject | LOG201: Supply Chain Management |
Question 1
Fashion brand H&M is a Swedish multinational retailer whose biggest markets are in Britain, Germany and the United States. It has about 4,000 stores in the world and is one of the most recognisable brands in the fashion industry.
Through the years, H&M has experienced changing consumer needs. Suppose H&M has identified that there is a growing preference for personalised design among its customers and they want to alter their network design to cope with this trend. Recommend a suitable network design for H&M to effectively cope with this trend. Your discussion should include the following:
- A diagram of your recommended distribution network design, including last-mile transport design, for H&M. Briefly explain how your recommended design works.
- Discuss the implications of your recommended network design on decisions related to facilities, inventory management and information infrastructure.
- Determine how your recommended design would affect demand forecasting at H&M.Question 2
CP Displays (CP) manufactures TV panels to serve demand in Africa, Asia, Europe, North America and South America. Potential sites for its manufacturing plants have been identified in Japan, Germany, Canada and Brazil. The capacity of the plant in each site is shown in Table
1. The demand from each region and the variable costs (production and shipping costs) at the sites are also shown in Table 1. CP also has to pay import duties for the shipments to the different regions. Use the import duty rates shown in Table 2 for the different regions. Assume the following:
– At most one plant to be built in each country (Japan, Germany, Canada and Brazil)
– Import duty is calculated based on the production and shipping costs
– Import duty is waived for TV panels shipped within the same region; no import duties are charged for shipments from:
- Japan to Asia
- Germany to Europe
- Canada to North America
- Brazil to South America
Table 1: Transportation, Demand, Capacity and Production Costs for CP

Table 2: Import Duty Rates

Compute where CP should build its manufacturing plants if it wants to minimise total cost.
Briefly state how the network should be structured. Please also include the formulation of the objective function, constraints and decision variables. Submit your solved excel file separately.
Your report (excluding the cover page, tables, references and appendices) should not exceed 1,500 words. Please do not retype the questions in your report.
Buy Custom Answer of This Assessment & Raise Your Grades
Are you desperately searching for someone to write my assignment on LOG201: Supply Chain Management Assignment? then don't worry Singapore Assignment Help experts serve excellent help on Logistics and supply chain management assignments. You can also hire our expert assignment service to get the unique solution on LOG 201 SUSS supply chain management report writing, case-study, dissertation writing and they also help you in getting an outstanding grade on your assignment.
Looking for Plagiarism free Answers for your college/ university Assignments.
- COR1100 Writing and Reasoning Assessment 3 , 2026 | SMU
- LOG206 Transport Management and Technology Group-based Assignment 2026 | SUSS
- NCO212 The ‘Smart City’ and Society Pre-Class Quiz Assignment 2026 | SUSS
- CVEN3501 Water Resources Engineering Coursework Brief 2026 | UNSW
- MKTG101 Marketing Coursework Brief 2026 | Singapore Management University
- NCO102 Effective Writing Tutor-Marked Assignment 1, 2026 | SUSS
- SC1101E Making Sense of Society Written Assignment 1 Brief 2026 | NUS
- BUSM2653 People Analytics Assesment 1 Insightful Analytics Report 2026 | SIM
- MLA604 Maritime Operations Assessment Brief 2026 | MLA College
- ICT226 Enterprise Systems and Integrated Business Process End-of-Course Assessment 2026 | SUSS
