This SIT project carries the campus solar design from Module 1 into a full smart-grid proposal. Teams analyse a year of campus load data, size a battery energy storage system (BESS) that can be traced back to the load profile, then build five HOMER cases with demand response and compare them on technical, economic and carbon results.
Module 2 – Load Analysis and Energy Storage Design
Required load analysis
- Reconcile annual consumption from the 5-minute and half-hourly datasets.
- Calculate annual and monthly energy consumption, maximum, average and minimum demand, load factor and peak-to-average ratio.
- Identify the duration, frequency and timing of significant demand peaks.
- Prepare weekday, weekend, monthly and demand-duration profiles.
BESS applications
The BESS should mainly support peak-demand reduction, PV self-consumption, tariff optimisation and demand-response operation. Backup supply and islanding are not required.
Storage technology assessment
Compare at least two storage technologies on capital and replacement cost, round-trip efficiency, depth of discharge, cycle and calendar life, C-rate, degradation, safety, environmental considerations and suitability for daily cycling.
Preliminary sizing
Using HOMER optimisation, determine a BESS power and energy range that is traceable to the load profile, operating objective and regulatory requirements: power rating (baseline peak minus target peak, with margin), usable energy (area above the target demand over the discharge period), nominal energy (adjusted for depth of discharge, efficiency and availability), converter rating and a range of candidate sizes. Any sizing method may be used (load profile analysis, published methods, HOMER optimisation or a combination), but it must be technically justified – an arbitrary battery size entered into HOMER is not accepted. Report Case 2 (grid + PV + BESS) against Case 1 to show the value of storage.
Module 3 – HOMER Integration and Demand Response
Minimum system cases
| Case | Configuration | Purpose |
| 0 | Grid only | Baseline |
| 1 | Grid + solar PV | PV contribution |
| 2 | Grid + solar PV + BESS | Storage value |
| 3 | Grid + solar PV + demand response | DR value |
| 4 | Grid + solar PV + BESS + demand response | Integrated smart-grid proposal |
Demand-response design
Represent DR quantitatively: identify flexible campus loads, define operating constraints and evaluate at least three participation levels (for example DR-Low 5%, DR-Medium 10% and DR-High 15% of applicable demand). Constraints cover maximum load shifted or curtailed, event duration and frequency, eligible hours, rebound effect, comfort limits, excluded critical loads and the tariff or control signal that triggers a response.
Smart-grid architecture and AMI
Propose a conceptual architecture across field devices (smart meters, PV inverters, BMS, power conversion, sensors, load controllers), building/edge (data concentrators, gateways, BMS), campus supervisory (SCADA, EMS, historian, DR management, dashboard) and enterprise/cloud layers. Specify metering points, measurements, reporting intervals, time synchronisation, bidirectional recording and justified communication media and protocols.
Required Analyses
- Technical: PV capacity and generation, renewable fraction, self-consumption and self-sufficiency, grid import/export, peak reduction, BESS throughput, cycles and state of charge, curtailed PV, DR energy shifted, losses and utilisation.
- Economic: capital costs (PV, BESS, converter, AMI, ICT), O&M and replacement, energy and demand charges, savings, NPC, NPV, LCOE, simple and discounted payback, ROI and IRR – comparing all cases, not only HOMER’s optimum.
- Environmental: annual and lifetime avoided emissions, battery replacement and end-of-life, renewable utilisation and curtailment.
Final Recommendation
Recommend one preferred configuration and explain the trade-offs between technical performance, investment cost, operating savings, carbon reduction, battery utilisation, DR practicality and smart-grid implementation.