This sustainable energy systems sample extract shows how a strong answer to the Singapore Institute of Technology project on Modules 2 and 3 can be organised: a BESS sized from the load profile, five HOMER cases, demand response and a recommendation. It follows the Modules 2 and 3 BESS sizing and HOMER smart grid brief. The question page does not print the campus data, so every figure below is illustrative, invented for teaching, and must be replaced by your own dataset and HOMER outputs. For the method behind each step, read our guide on how to size a BESS and build HOMER smart grid cases. The answer is abridged.
Planning table
| Brief part | Deliverable | What markers look for |
|---|---|---|
| Load analysis | Statistics, peak events, four profiles | Datasets reconciled; load factor and peak-to-average ratio calculated |
| Storage technologies | Comparison of at least two | Cost, efficiency, depth of discharge, life and safety judged against daily cycling |
| BESS sizing | Power, usable and nominal energy, candidate range | A chain from the load curve to the size, not an arbitrary entry in HOMER |
| Five HOMER cases | Technical, economic and carbon table | All cases compared, not only HOMER’s top-ranked result |
| Demand response and architecture | Three participation levels, constraints, layered design | Quantified response with rebound and comfort limits |
Check your own brief for the exact mark split before copying any of these proportions.
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
Native Singapore Writers Team
- 100% Plagiarism-Free Essay
- Highest Satisfaction Rate
- Free Revision
- On-Time Delivery
Module 2: load analysis and storage design
Load statistics (illustrative)
The half-hourly kWh readings are converted to kW by multiplying by two, then checked against the 5-minute data so that both datasets give the same annual total. The 5-minute series is used for peak duration, because half-hourly averaging hides short spikes.
| Metric | Value | Working |
|---|---|---|
| Maximum demand | 6.0 MW | Highest half-hourly kW |
| Average demand | 3.2 MW | 28,032 MWh / 8,760 h |
| Load factor | 53.3% | 3.2 / 6.0 |
| Peak-to-average ratio | 1.88 | 6.0 / 3.2 |
| Time above 5.2 MW | about 110 h a year | Counted from the demand-duration curve |
A load factor near 53% and a short tail of high demand are the conditions in which peak shaving is worth testing, because a small battery can remove a high-cost slice of the peak (Hesse et al., 2017).
Storage technology comparison
| Criterion | Lithium iron phosphate (LFP) | Vanadium redox flow |
|---|---|---|
| Round-trip efficiency (typical) | About 90% | About 65 to 75% |
| Usable depth of discharge | About 90% | Close to 100% |
| Cycle and calendar life | Several thousand cycles; calendar ageing and degradation must be modelled | Very long cycle life; electrolyte lasts, pumps and stacks need maintenance |
| Footprint and energy density | Compact, important on a campus | Large tanks and a bigger footprint |
| Safety and environment | Thermal-runaway risk managed by BMS, fire design and recycling plans | Non-flammable electrolyte; vanadium handling and end-of-life recovery |
| Fit for daily cycling of 2 to 3 hours | Strong | Technically suitable, weaker on cost and space |
The ranges are typical published values and should be replaced by supplier data in your own work. LFP is carried forward because of its efficiency, footprint and suitability for daily cycling.
Preliminary sizing
Power rating: the design peak is 6.0 MW and the target peak is set at 5.2 MW from the demand-duration curve, so the shaving requirement is 0.8 MW. A 10% margin gives 0.88 MW, rounded to a 0.9 MW rating with a 1.0 MW converter. The load peak of 6.0 MW is used rather than the lower post-PV peak of 5.9 MW because solar output cannot be relied on at the evening peak; the 0.1 MW difference is part of the margin.
Usable energy: on the design peak day the area above the 5.2 MW target is summed from the half-hourly profile.
| Half-hour block | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
|---|---|---|---|---|---|---|---|---|---|---|
| Excess above 5.2 MW (kW) | 150 | 300 | 450 | 600 | 800 | 700 | 550 | 400 | 250 | 100 |
The excess totals 4,300 kW, so the usable energy is 4,300 x 0.5 h = 2,150 kWh, or 2.15 MWh.
Nominal energy: usable energy is divided by depth of discharge (0.90), one-way discharge efficiency (the square root of 0.90 round-trip, about 0.949) and availability (0.98). Nominal energy = 2.15 / (0.90 x 0.949 x 0.98) = 2.57 MWh, rounded to 2.6 MWh. The result is a C-rate of about 0.38C on the 1.0 MW converter.
Candidate range for HOMER: power 0.5, 0.75, 1.0 and 1.25 MW; energy 1.5, 2.0, 2.6, 3.0 and 3.5 MWh. HOMER then tests this window instead of an arbitrary single battery (HOMER Energy, n.d.).
Module 3: HOMER cases and demand response
Assumptions (illustrative)
Project life 25 years, real discount rate 6%, grid energy charge S$0.20/kWh, demand charge S$20/kW-month, PV 3 MWp at S$1,200/kWp yielding 1,400 kWh/kWp (4,200 MWh a year), BESS S$650/kWh installed with a 12-year life and a replacement at 60% of the original cost, DR control and metering S$150,000. Grid emission factor 0.40 kg CO2/kWh, an assumption to be replaced by the current factor published by the Energy Market Authority. Operating costs are 1.5% (PV), 2% (BESS) and 5% (DR) of capital cost a year.
The battery is assumed to cycle about 250 times a year, so about 60 MWh of annual import is added by round-trip losses (the flat energy price makes the shifting itself cost-neutral).
Demand response design
Flexible load is taken as 3.0 MW at the peak (chillers, air-conditioning set-points, EV charging). Three participation levels are tested: DR-Low 5% (0.15 MW), DR-Medium 10% (0.30 MW) and DR-High 15% (0.45 MW). Constraints: events of up to 2 hours, no more than 20 events a year, eligible hours 14:00 to 18:00 on weekdays, laboratories and critical loads excluded, comfort limits on indoor temperature, and 90% of shifted energy returning within two hours as rebound. DR-Medium is used in Cases 3 and 4. Singapore’s Energy Market Authority has reported that demand response has already saved electricity buyers more than S$700 million between 2023 and mid-2024, which supports treating DR as a real resource (Energy Market Authority, 2024).
Comparison of the five cases (illustrative)
| Case | Capital (S$m) | Annual grid bill (S$m) | NPC (S$m) | LCOE (S$/kWh) | Peak (MW) | Import (GWh) | Renewable fraction | CO2 (kt/yr) |
|---|---|---|---|---|---|---|---|---|
| 0 Grid only | 0.00 | 7.05 | 90.08 | 0.2514 | 6.0 | 28.03 | 0% | 11.21 |
| 1 Grid + PV | 3.60 | 6.18 | 83.32 | 0.2325 | 5.9 | 23.83 | 15.0% | 9.53 |
| 2 Grid + PV + BESS | 5.29 | 6.03 | 83.95 | 0.2343 | 5.2 | 23.89 | 15.0% | 9.56 |
| 3 Grid + PV + DR | 3.75 | 6.11 | 82.65 | 0.2306 | 5.6 | 23.83 | 15.0% | 9.53 |
| 4 Grid + PV + BESS + DR | 5.44 | 5.95 | 83.28 | 0.2324 | 4.9 | 23.89 | 15.0% | 9.56 |
Worked check for Case 2: energy charge 23,892 MWh x S$0.20/kWh = S$4.78 million, demand charge 5,200 kW x S$20 x 12 = S$1.25 million, giving S$6.03 million a year. NPC includes capital, the discounted BESS replacement, and 25 years of operating and grid costs, discounted with an annuity factor of 12.78. LCOE is the annualised NPC (capital recovery factor 0.0782) divided by the 28,032 MWh served; the NPC concept follows HOMER’s life-cycle definition (HOMER Energy, n.d.).
Economic and technical reading
PV delivers the largest gain: NPC falls by S$6.76 million against Case 0 and the renewable fraction is 15.0% (4,200 / 28,032). PV barely changes the peak, from 6.0 to 5.9 MW, because the peak occurs when solar output is low.
Storage value, Case 2 against Case 1: peak falls by 0.7 MW and the annual bill by S$156,000, but the extra capital is S$1.69 million. Net of S$33,800 of extra operating cost, simple payback is 1.69 / 0.1222 = 13.8 years, longer than the assumed 12-year battery life, and NPC rises by S$0.63 million. On these inputs the BESS breaks even only at about S$490/kWh installed.
DR value, Case 3 against Case 1: S$72,000 a year saved for S$150,000 of capital and S$7,500 of operating cost, a simple payback of 2.3 years, and the lowest NPC of the five cases.
Case 4 gives the deepest peak cut (4.9 MW, 18% below baseline) and the lowest annual bill, but its NPC is S$0.63 million above Case 3. Emissions fall 15% from 11.21 to 9.53 kt a year with PV; the BESS slightly raises them through losses.
Smart-grid architecture and AMI
Field layer: revenue-grade smart meters at the campus incomer, PV inverters, BESS and each major chiller plant, recording bidirectional kWh and kW at 5-minute intervals, time-synchronised by NTP. Building layer: gateways and the building management system, using BACnet/IP for building plant and Modbus TCP for inverters and the BMS of the battery. Supervisory layer: SCADA, an energy management system that dispatches the BESS and DR events, and a historian. Enterprise layer: a dashboard, tariff data and reporting. Wired Ethernet or fibre is used for control signals and cellular or wireless links only for remote monitoring, with network segmentation for cybersecurity.
Recommendation
Case 3 (PV plus DR) is preferred on cost: lowest NPC (S$82.65 million), lowest LCOE and a payback of 2.3 years on the DR element, with the same emissions as Case 1. The battery should be treated as a staged option: Case 4 gives the lowest peak and most flexibility, so it becomes attractive if installed cost falls towards S$490/kWh or the demand charge or DR incentives rise. The trade-off is therefore cost against peak reduction and resilience, not simply HOMER’s cheapest result.
Need help with a project like this? Our electrical power engineering assignment help and report writing help pages explain what support is available, you can browse the wider engineering assignment help service, or submit your assignment details for a tailored quote. Other SIT briefs are listed in our Singapore Institute of Technology question library.
References
Energy Market Authority (2024) New initiatives to harness demand flexibility potential in Singapore. Media release, 21 October. Available at: https://www.ema.gov.sg/news-events/news/media-releases/2024/new-initiatives-to-harness-demand-flexibility-potential-in-sg
Hesse, H.C., Schimpe, M., Kucevic, D. and Jossen, A. (2017) ‘Lithium-ion battery storage for the grid: a review of stationary battery storage system design tailored for applications in modern power grids’, Energies, 10(12), article 2107. Available at: https://www.mdpi.com/1996-1073/10/12/2107
HOMER Energy (n.d.) Total net present cost in HOMER. HOMER Knowledge Base. Available at: https://homerenergy.com/docs/knowledgebase/article/total-net-present-cost-in-homer/