To size a BESS for a campus smart-grid project, convert your half-hourly data to kW, set a target peak from the demand-duration curve, take the power rating from the gap between the baseline peak and that target, take the usable energy from the area above the target, then adjust for depth of discharge, efficiency and availability. Only then should you let HOMER test a range of candidate sizes. Markers want a visible chain from the load data to the battery, and a recommendation that weighs the five cases rather than copying HOMER’s top-ranked result. If you want help with the engineering side, see our electrical power engineering assignment help.
What the Modules 2 and 3 project is really asking
The Singapore Institute of Technology Sustainable Energy Systems project carries a Module 1 solar design into a full smart-grid proposal. Teams analyse a year of campus demand, size a battery energy storage system, build five HOMER cases with demand response, and compare them on technical, economic and carbon results. You can read the wording on the Modules 2 and 3 BESS sizing and HOMER question page.
The brief is explicit that an arbitrary battery size typed into HOMER is not accepted. Every number needs a reason that traces back to the load profile, the operating objective and the regulatory limits.
The structure that earns marks
| Section | What to show | Common weak point |
|---|---|---|
| Load analysis | Annual and monthly energy, maximum, average and minimum demand, load factor, peak-to-average ratio, four profiles | The two datasets never reconciled |
| Storage technologies | At least two options judged on cost, efficiency, depth of discharge, life, C-rate, safety | Listing facts without choosing one |
| BESS sizing | Power, usable energy, nominal energy, converter rating, candidate range | A round number with no working |
| Five HOMER cases | One table with NPC, LCOE, renewable fraction, peak, emissions | Reporting only the optimum |
| Demand response | Three participation levels with constraints | A percentage with no rebound or comfort limit |
| Architecture | Layers, metering points, intervals, protocols | A generic diagram with no justification |
To see these sections laid out with illustrative figures, open our Sustainable Energy Systems BESS and HOMER sample answer, which is for reference only.
Need a second pair of eyes on your set-up? You can submit your assignment details for a plan and quote.
Step 1: Analyse the load before you open HOMER
Half-hourly kWh values become kW when you multiply by two. Check that the 5-minute and half-hourly files give the same annual energy, and say how you resolved any gap. Use the 5-minute data for peak duration, because half-hour averaging can hide short spikes.
Then calculate load factor (average demand divided by maximum demand) and the peak-to-average ratio. A low load factor with a short, sharp peak is the classic case where a modest battery has real value.
Step 2: Choose a target peak and size from the curve
Read the demand-duration curve to find a target peak that is reached for only a small number of hours a year. The gap between the baseline peak and that target is the power requirement. Add a margin, typically around 10%, and round to a converter size.
For energy, sum the area above the target over the discharge period on your design peak day. That is the usable energy. Nominal energy is larger, because you divide by depth of discharge, discharge efficiency and availability. Finish by listing a range of candidate sizes around the result, so HOMER has a defined window to search.
Step 3: Compare at least two storage technologies
Pick criteria that matter for daily peak shaving: efficiency, usable depth of discharge, cycle life, calendar life, footprint, safety and replacement cost. Lithium iron phosphate usually wins on efficiency and footprint, while flow batteries offer long cycle life and non-flammable electrolyte at a lower efficiency and a larger footprint. State your choice and the one condition that would change it.
Step 4: Build the five HOMER cases
| Case | Configuration | Question it answers |
|---|---|---|
| 0 | Grid only | What is the baseline cost and carbon? |
| 1 | Grid + PV | What does solar contribute? |
| 2 | Grid + PV + BESS | What does storage add to Case 1? |
| 3 | Grid + PV + demand response | What does flexibility add to Case 1? |
| 4 | Grid + PV + BESS + demand response | Is the integrated proposal worth its extra cost? |
Keep the tariff, discount rate, project life and emission factor identical in every case, so differences come from the configuration alone. Compare each case with the one that precedes it logically, for example Case 2 against Case 1 to show the value of storage.
Step 5: Make demand response quantitative
Define the flexible loads first, such as chillers, air-conditioning set-points and EV charging. Test three participation levels, for example 5%, 10% and 15% of applicable demand. For each, state the maximum load shifted, event length and frequency, eligible hours, rebound, comfort limits, excluded critical loads and the signal that triggers a response. Without these, a percentage is only a label.
Splitting the work in a team
A team project fails most often at the hand-offs. Agree one owner for the load analysis, one for the BESS sizing, one for the HOMER models and one for the economic and carbon tables, and agree the assumptions table before anyone runs a simulation.
Hold a short check after the load analysis, because every later number depends on it. Run the five HOMER cases only after the sizing window is fixed, and leave at least two days to rewrite the discussion once the results are in. Results rarely match expectations on the first run, and the explanation of why is where analytical marks are won.
Mark-maximising checklist
- Annual energy reconciled across both datasets.
- Peak events described by duration, frequency and timing.
- Target peak chosen from the demand-duration curve and justified.
- Power, usable energy and nominal energy each shown with a calculation.
- At least two storage technologies compared against daily cycling.
- All five cases in one table with the same assumptions.
- Payback, NPV and IRR shown for the added equipment, not only NPC.
- Emissions and battery end-of-life discussed.
- A single recommendation that names its trade-offs.
Common mistakes
- Typing a battery size into HOMER without a sizing method.
- Using the 5-minute total and the half-hourly total as if they agreed.
- Sizing power from the post-PV peak when solar is not available at the peak hour.
- Forgetting round-trip losses, so the battery appears to cost nothing to operate.
- Leaving out replacement cost over the project life.
- Treating demand response as free, with no control, metering or rebound.
- Recommending the HOMER-ranked winner without discussing the other cases.
Student pain points
“HOMER gives me a bigger battery than my calculation.” That is useful. Explain the difference, for example degradation margin or a different target peak, and decide which size you recommend.
“The battery never pays back.” This can be a valid result. Report the break-even installed cost or tariff and recommend staging the battery, rather than forcing the answer.
“I do not know how much detail the architecture needs.” Name each layer, list the metering points and intervals, and justify each communication medium in one line.
“My team has different numbers in different files.” Keep one assumptions table and quote it in every section.
How to present the final recommendation
Lead with the preferred case, then give the evidence in three groups: technical performance, economics and carbon. Close with what would change the decision. Our report writing help can help you structure a long technical report so the logic is easy to follow, and you can learn more about our approach on the about us page.
FAQs
Can I use any sizing method for the BESS?
Yes, provided it is technically justified. Load profile analysis, a published method, HOMER optimisation or a combination are all acceptable, but an arbitrary size is not.
What is the difference between usable and nominal energy?
Usable energy is what the battery must deliver. Nominal energy is the larger rated capacity needed once depth of discharge, efficiency and availability are accounted for.
Do I need to include backup power or islanding?
Not for this brief. The battery is mainly for peak reduction, PV self-consumption, tariff optimisation and demand response.
Why compare all five cases and not only HOMER’s best?
Because the marks are for the trade-off. The lowest-cost case may differ from the lowest-peak or lowest-carbon case, and your recommendation should explain why you chose one.
How do I treat rebound in demand response?
State what share of shifted energy returns after the event and over how long, then include it in the load profile so the peak is not simply moved to a later hour.
Which metrics belong in the economic analysis?
Capital cost, operating and replacement cost, savings, NPC, NPV, LCOE, simple and discounted payback, ROI and IRR, compared for every case.
When your data and HOMER runs are ready and you want them checked or built with you, talk to our engineering assignment help team.