University | Singapore University of Social Science (SUSS) |
Subject | FMT302- Operation and Maintenance of Building Services |
Question 1
A good maintenance program focuses more on preventive and predictive maintenance and less on corrective maintenance. Professional facility managers tasked to perform the operation and maintenance of major building services need to establish maintenance strategies to achieve a cost-effective mix maintenance program.
Question 1a
Examine TWO (2) components of maintenance and propose THREE (3) maintenance strategies that may be adopted to achieve a cost-effective mix maintenance program. (10 marks)
Question 1b
Appraise at least THREE (3) types of monitoring tools used by facility managers to perform condition-based maintenance of building services such as electrical panels, pumps, motors, and chillers for energy efficiency. (15 marks)
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
Native Singapore Writers Team
- 100% Plagiarism-Free Essay
- Highest Satisfaction Rate
- Free Revision
- On-Time Delivery
Question 2
Indoor air quality (IAQ) has a profound impact on the health, wellbeing and comfort of occupants in built environments as occupants typically spend more than 90% of their time in indoor environments. Efforts to control IAQ would require the facility management team to put in place an IAQ management plan and to ensure that all the staff and occupants of the building will follow and comply.
Question 2a
Formulate an IAQ Management Plan to comply with relevant regulations and promote the wellbeing and health of the occupants in the indoor environments. (11 marks)
Question 2b
Propose at least THREE (3) broad IAQ strategies to improve indoor air quality. (9 marks)
Question 2c
Air filters play a critical role in maintaining indoor air quality and protecting the downstream components of Air Handling Units from dirt that reduces equipment efficiency. Implement measures to prevent supply air bypassing the air filters and depositing dirt on the cooling coils rather than on the filter. (5 marks)
Question 3
One of the main objectives of maintenance and operation of building services is to achieve energy efficiency. Benchmarking of energy consumption allows building owners to seek ways to reduce energy consumption for their facility or building.
Buy Custom Answer of This Assessment & Raise Your Grades
Question 3a
Examine at least TEN (10) best practices or practical solutions to achieve energy efficiency in the maintenance of electrical systems for office workplaces. (10 marks)
Question 3b
Implement at least FIVE (5) maintenance and operation activities to improve water-cooled chiller performance efficiency and reduce energy consumption. (15 marks)
Question 4
The main purpose of a fire protection system is to detect, control, extinguish and alert building occupants to fire or fire-related smoke. The Fire Code prescribes minimum periodic inspection, testing, and other operation and maintenance requirements for the primary fire protection systems such as sprinkler systems, wet riser and dry riser systems, and fire alarm systems. Therefore, preventive measures involving the operation and maintenance activities of the systems are crucial to comply with the Fire Code.
Question 4a
Examine the difference between “Operation” and “Maintenance” activities. (5 marks)
Question 4b
Demonstrate your understanding of at least FIVE (5) operation activities for fire alarm systems and the knowledge required to conduct these activities. (10 marks)
Stuck with a lot of homework assignments and feeling stressed ? Take professional academic assistance & Get 100% Plagiarism free papers
Question 4c
Implement at least TEN (10) maintenance activities for fire alarm systems to always ensure good connectivity of the building’s fire alarm signal input to the fire department’s system. (10 marks)
Looking for Plagiarism free Answers for your college/ university Assignments.
- AVET104 Journey Through the Cell Assignment: A Molecular Adventure into Life’s Inner Workings
- Workplace Risk-Based Assessment 1: Evaluation of Hazards, Accidents, and Safety Compliance
- SRM Reflective Assignment 2: Applying Gibbs Model to Overcome Workplace Report Challenges
- ACLP M1P TAE Written Assignment: Skills Framework & Lesson Plan Design Using Gagne’s and Kolb’s Models
- EGH222 Healthcare Analytics Assignment 2: Predictive Model for Sick Days Based on Employee Demographics and Lifestyle Data
- Sustainability Strategy Assignment: Selected Company Case Study on Addressing Sector Challenges and Driving Behavioural Change Campaigns
- 7WBS2012 Executive Career Development Assignment: Career Pathway & Readiness Post-MBA in Education Management
- CVE2322 Gantry Build Prototype Assignment: Sustainable Civil Engineering Model Using Recyclable Materials
- BMG706 Strategic Quality Change Assignment Report: Enhancing Operational Excellence at any Organization
- CVE2323 Structural Analysis Assignment: Matrix Method & STAAD.Pro Evaluation of Frame Systems