University | Singapore University of Social Science (SUSS) |
Subject | FMT302- Operation and Maintenance of Building Services |
Airports are large buildings equipped with air-conditioning and ventilation systems and the high-power demand for lighting and electric equipment and the energy requirements from the many facilities located within the airport precinct. Thus, energy management – which includes heating, ventilation, air conditioning (HVAC), and lighting—is extremely important for airports.
The Energy Management Centre (EMC) at the SG International Airport provides nonstop cooling air to Terminal A and its passenger arrival/departure concourses, through which nearly 100,000 travelers pass daily. The Airport Facilities Management Office operates the EMC’s four 2,000-ton chillers, each with its own cooling tower, pumps, and piping, which comprise the central chiller system that cools 2.8 million square feet of space in Terminal A and its concourses. Central chiller plants and pumping loops are common in multiple-building settings such as university campuses, hospital complexes, and business campuses.
During the dry season months from April to October, the EMC chiller plant delivered only about 5,400 tons of cooling, well below its design capacity. The user detected an abnormality in terms of its raised operating temperature and fluid discharge beneath the equipment. In addition, the plant was wasting energy because too much air in the condenser water pipes prevented the cooling towers from taking enough heat out of the chillers.
Under these circumstances, the system struggled to cool the main Terminal A, its concourses, and the adjacent multi-story parking ramp. The operational condenser approach temperature of the Chiller was observed to be higher than 3°C.
Question 1
With reference to the type of building services/systems discussed in study units of this course, identify and examine the major systems installed in the Airport facility.
Question 2
- Appraise the operation and maintenance of the Airport’s ACMV system and,
- Determine the possible defects of the system and causes of poor performance of the chiller plant.
Question 3
Propose the action plans and the maintenance strategy needed to rectify the defects and improve the system’s performance.
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
Native Singapore Writers Team
- 100% Plagiarism-Free Essay
- Highest Satisfaction Rate
- Free Revision
- On-Time Delivery
At Singaporeassignmenthelp.com, we provide top-notch case study writing help for students who are struggling with their academic assignments. Our team of expert assignment writers and researchers are equipped with the knowledge and skills to craft high-quality case studies that will help you score high grades. We understand the importance of case studies in your academic journey, which is why we offer customized solutions that cater to your specific needs. So, contact us today and get the possible help!
Looking for Plagiarism free Answers for your college/ university Assignments.
- ECE210 Advocacy and Collaborations with Families Assignment: Supporting Young Children Through Grief and Family-Centered Partnerships
- ACC707 Accounting and Finance Assignment: Evaluating Investment Decisions, Budgeting Strategies, and Financial Performance Analysis
- NCO201 Learn to Learn, Learn for Life TMA-01: Developing Self-Directed Learning Through the Journey of Mastering Public Speaking
- PSS219 Public Safety and Security in Singapore Group-Based Assignment: Strengthening National Resilience Through Policy Responses from the 2025 Committee of Supply Debate
- MTH240 Engineering Mathematics I Assignment: Heat Transfer, Chemical Balancing, Circuit Analysis, Signal Processing, and Matrix Theory
- Engaging Youth with IBM Skills Build Assignment: Designing Innovative Strategies for Skill Development and Career Growth
- BUS368 Innovation Management and Digital Transformation Assignment: Managing Innovation in Foldable, Trifold, and Stretchable Display Technologies
- BUS366 Assignment: Process Improvement and Recruitment Optimization Using Lean Six Sigma Methodology
- HBC203 Statistics and Data Analysis for the Social and Behavioural Sciences TMA-01: A Comparative Analysis of Workplace Wellbeing Interventions and Their Impact on Employee Productivity
- BCAF003 Business Accounting Assignment: A Comprehensive Study on Bank Reconciliation, Cash Controls, Inventory Valuation, and Financial Analysis