University | Singapore Institute of Technology (SIT) |
Subject | EPE3301: Power Electronics Assignment |
Hybrid and fully electric vehicles are the current trends in the automotive industry. To reduce CO: emissions, a 48 V DC system has been proposed by the European automotive industry. This allows the same electrical power being delivered at a reduced current that minimises resistive losses.
The shift to 48 V also allows greater power delivery. To avoid substantial change to the automotive electrical system, the first step is to implement 48 V alongside the 12 V we have used for decades. The strategy is to move all power-hungry components to the 48 V side depicted in Fig. 1. Four identical boost converters shown in Fig. 2 are connected in parallel to share the rated power of 2 kW.
Buy Custom Answer of This Assessment & Raise Your Grades
This coursework aims to design a 500-W DC-DC boost converter (Fig. 2) for the abovementioned application. The design should fulfil the following specifications:
- Input voltage: 12 V
- Output voltage: 48 V
- Output power: 100 W to 500 W
- Mode of operation: continuous conduction mode (CCM)
- Operating frequency: 100 kHz
- Inductor current ripple: less than 1% of average inductor current at rated power
- Capacitor voltage ripple: less than 1% of average capacitor voltage at rated power
You are required to complete the following tasks in a group of three (free to choose your group members):
(a) Perform theoretical design and calculation for the boost converter (Fig. 2). Specify any assumptions considered in your calculation.
(b) Validate your design by simulation considering ideal components. Simulation can be conducted with Matlab Simulink, PSIM, PLECS or other relevant circuit simulation software.
(c) Choose a suitable power switch (S} and S2 in Fig. 2) for your design. Some useful component distributors for finding power switches are:
RS Components: https: ”sg.rs-online.com/web‘
Element] 4: https:‘’sg.element]4.com’
Mouser Electronics: https://www.emouser.sg!
(d) Calculate the power losses for switches $1 and S2 under rated power (500 W), based on the datasheet information. Specify any assumptions considered in your calculation.
(e) Model the power switches $1 and S2 according to the datasheet information for simulating the boost converter considering practical power switches (non-ideal power switches). Validate the power losses calculated in (d) and analyse the efficiency of the boost converter. Perform comprehensive simulation study to validate your design in accordance with the specified requirements/specifications.
(f) Write a report to thoroughly discuss your design, result, and analysis.
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
Native Singapore Writers Team
- 100% Plagiarism-Free Essay
- Highest Satisfaction Rate
- Free Revision
- On-Time Delivery
Empower your academic journey at the Singapore Institute of Technology (SIT) with our dedicated support. Struggling with EPE3301 Power Electronics Assignment? Look no further – our expert team provides specialized assistance for individual assignments. Our trusted assignment helper service is designed to meet the unique needs of SIT students. Additionally, explore the excellence in our dissertation help in Singapore. Pay our experts for tailored guidance, ensuring your success in EPE3301 and beyond.
Looking for Plagiarism free Answers for your college/ university Assignments.
- PSB503IT Team Project Reflective Report Assignment: Enhancing Collaboration and Professional Development
- Microbiology Assignment: The Role of Medical Microbiologists in Disease Control and Their Contribution to Public Health
- A2389C Pharmaceutical Supply Chain Case Study Assignment: Emergency Preparedness Plan for Tariff Impact in Singapore
- Mobile Learning App Evaluation Report Assignment: Usability, Design, and Learning Outcome Analysis
- CTA Psychotherapy Intervention Essay Assignment: Sheila Case Study on Managing Anxiety and Marital Stress
- DSM500 Machine Learning Project Proposal: Retail Sales Forecasting with Time Series Models
- Project Management Assignment 2: The Shard UK Case Study on Risk & Stakeholder Strategies in Construction Projects
- CSIT121 Banking Application Assignment: OOP-Based Customer & Account Management System in Python
- PSB333MAE Assignment 1 Report: Structural Analysis & Optimisation Using SolidWorks and Direct Stiffness Method
- Economics Assignment Questions: Factors of Production, Demand Behavior & Global Coffee Market