University | Republic Polytechnic (RP) |
Subject | E245: Systems and Project Management |
Assignment Details:
The Thomson-East Coast MRT Line (TEL) was first announced on 25 January 2008 and was slated for opening in 2018 according to the Land Transport Masterplan. However, it was later pushed back to 2019, and again to January 2020. On 31 January 2020, TEL Stage 1 which comprises Woodlands North, Woodlands, and Woodlands South stations became fully operational. The line is operated by SMRT Trains Pte Ltd.
You are a project team member with SMRT Trains Pte Ltd. The management has requested you to provide a review report summarising the key ideas of project management and systems engineering relating to TEL Stage 1.
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
Native Singapore Writers Team
- 100% Plagiarism-Free Essay
- Highest Satisfaction Rate
- Free Revision
- On-Time Delivery
Based on sound academic framework acquired in this module, you should discuss the following:
- Identification and analysis of the stakeholders for TEL Stage 1
- Project schedule and project costing
- Identify any system within the MRT infrastructure (e.g. platform screen doors,
train carriages, ticketing machine, entry/exit gantries, rail network, escalators, lifts, etc.) and elaborate on any two of the following:- Needs Analysis and Requirements Definition
- System Architecture
- Tradespace Constraints and TRIZ
- Risk Management
- Integration, Verification, and Validation
Your report should have an introduction and conclusion and should be between 1000 – 1500 words. The word count should exclude the Cover Page, Executive Summary, Table of Contents, References, and Appendices.
We have a special team of in-house assignment writers at SingaporeAssignmentHelp.com who provide prominent help with project management assignments to the Republic Polytechnic students. With our professional's guidance in (E245) Systems and Project Management, you will learn about the topic, the process of doing your assignment, and applying project management concepts to real case studies and how to prepare a report for this. For more details check out our free project management essay sample.
Looking for Plagiarism free Answers for your college/ university Assignments.
- ACFI3004 Australian Tax Residency & Income Assessment: Heny & Joceline Case Analysis
- CSIT213 Java OOP Assignment 1: ECommerce Management System Implementation Without Collections
- A2369C cGMP Compliance Assignment: Internal Audit CAPA Report for Quality Issues in Pharmaceutical Manufacturing
- E2419C Health Products Logistics Assignment: Cold Chain & DG Pharma Handling Case Study for Regulatory Compliance in Singapore
- AVET104 Journey Through the Cell Assignment: A Molecular Adventure into Life’s Inner Workings
- Workplace Risk-Based Assessment 1: Evaluation of Hazards, Accidents, and Safety Compliance
- SRM Reflective Assignment 2: Applying Gibbs Model to Overcome Workplace Report Challenges
- ACLP M1P TAE Written Assignment: Skills Framework & Lesson Plan Design Using Gagne’s and Kolb’s Models
- EGH222 Healthcare Analytics Assignment 2: Predictive Model for Sick Days Based on Employee Demographics and Lifestyle Data
- Sustainability Strategy Assignment: Selected Company Case Study on Addressing Sector Challenges and Driving Behavioural Change Campaigns