University | Singapore University of Social Science (SUSS) |
Subject | BPM213: Procurement Management |
Project Information
An autonomous University plans to build a new Convention Centre with the goal of earning the Zero Energy Building (ZEB) Award under its sustainable campus initiative.
To ensure sustainability, the Convention Centre will be built using eco-friendly materials such as mass engineered timber, incorporate energy and water efficiency features, and follow universal design principles.
Key sustainable features include a passive induction air-conditioning system, natural daylight, and water conservation measures.
The University is leveraging green technologies and innovative construction for this project, using Prefabricated Pre-finished Volumetric Construction (PPVC) to enhance speed and productivity. With an $80 million budget for the Convention Centre, it will use a Design & Build contract and procure the contractor via Selective Tendering.
You are to advise on tender document preparation, specification writing styles, and incorporating sustainable elements for this project.
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
Native Singapore Writers Team
- 100% Plagiarism-Free Essay
- Highest Satisfaction Rate
- Free Revision
- On-Time Delivery
Part A: Tender Documentation
1. Explain the purpose and the main content of the following tender documents for the Convention Centre project. You must also prepare a sample document for each listed item.
(a) Criteria on pre-qualification of tenderers
(8 marks)
(b) The Tender Notice
(8 marks)
(c) The Conditions of Tendering
(8 marks)
(d) The PQM Evaluation Criteria Table
(8 marks)
Part B: Specifications
2. Answer the following relating to specifications for the Convention Centre project.
(a) Identify the most suitable specification type for the project and compare it with other types of specifications. Provide reasons to support your answer.
(10 marks)
(b) Draft THREE (3) specification clauses for each of following:
- Sustainable construction materials
- Energy efficient features
- Smart technological adoption
(18 marks)
(c) Explain the differences between general specification and technical specification, including how they are used, their content and order of arrangement.
(12 marks)
Buy Custom Answer of This Assessment & Raise Your Grades
Part C: Electronic and Sustainable Procurement
3. The University intends to adopt electronic processes and sustainable procurement strategies for this project.
(a) Discuss the advantages and difficulties in implementing electronic procurement platforms to facilitate procurement processes, from sourcing to the award of contractor. Include both the University’s and tenderers’ perspectives in your answer.
(14 marks)
(b) Discuss the procurement strategies, from design through to operations, that consistently maintain sustainable features and systems. Examine how they meet the requirements of the “Zero Energy Building” (ZEB) award and ensure sustainable operations throughout the building’s life cycle.
(14 marks)
Stuck with a lot of homework assignments and feeling stressed ? Take professional academic assistance & Get 100% Plagiarism free papers
Looking for Plagiarism free Answers for your college/ university Assignments.
- Mobile Learning App Evaluation Report Assignment: Usability, Design, and Learning Outcome Analysis
- CTA Psychotherapy Intervention Essay Assignment: Sheila Case Study on Managing Anxiety and Marital Stress
- DSM500 Machine Learning Project Proposal: Retail Sales Forecasting with Time Series Models
- Project Management Assignment 2: The Shard UK Case Study on Risk & Stakeholder Strategies in Construction Projects
- CSIT121 Banking Application Assignment: OOP-Based Customer & Account Management System in Python
- PSB333MAE Assignment 1 Report: Structural Analysis & Optimisation Using SolidWorks and Direct Stiffness Method
- Economics Assignment Questions: Factors of Production, Demand Behavior & Global Coffee Market
- GSGM 7223 Strategic Transformation Assignment: Global Foods Ltd Case Study on Change Management and Digital Innovation
- PAC Research Proposal Report Assignment 1: Accounting and Finance Topics
- 7025CL Management Report Assignment: Investment Appraisal and Cash Budgeting – A Financial Feasibility Study for Gamiquest Corporation