University | Singapore University of Social Science (SUSS) |
Subject | BPM209: Cost Management for C&S Works |
Question 1
(a) Explain the meaning of “deemed to be included” and its implication on pricing as used in CP 97.
(b) Identify the clauses and explain the extra works/labours that are deemed to be included in the description and measurement of:
(i) Bored piles (15 marks)
(ii) Structural Steelwork (10 marks)
Question 2
With reference to Figures 1 and 2, interpret the drawings and scope of the C & S works.
(a) Apply measurement technique to prepare a take-off list, cite the relevant clauses from CP 97 for measuring the excavation, concrete and brick works including associated damp-proof materials.
(b) Apply measurement technique to take off quantities for the excavation works.
(c) Apply measurement technique to take off quantities for the concrete, formwork and hard-core layer.
(d) Apply measurement technique to take off quantities for the brick wall and damp proofing materials. (Note: Brick wall is to be measured up to the damp proof course level).
Specifications:
1. The existing ground level is fairly flat. Over site excavation is to commence from existing ground level (EGL).
2. Surplus excavated materials are to be disposed off site.
3. Hard core shall be of broken bricks and stones, well compacted and blind with a layer of sand at the top.
4. Lean concrete shall 75 mm thick and of grade 15.
5. Reinforced concrete for strip foundation and ground slab shall be of grade 35.
6. Formwork shall be of sawn timber.
7. Damp proofing materials shall be 20 mm thick, comprising 2-layers of hessian based bituminous felt.
8. Brick wall shall be 225 mm brick thick in common bricks, laid English bond and bedded & jointed in cement and sand mortar (1:3).
Question 3
With reference to Figures 3 and 4, interpret the drawings and scope of the C & S works.
(a) Apply measurement technique to take off quantities for the steel Lattice Girder (Assume twelve sets of girders, each 2.00 m high. The bearing level of the steel truss is at 5.50 m above the existing ground level).
(b) Apply measurement technique to take off quantities for the steel portal frame structure (Assume nine sets of portal frame).
Specifications:
1. Haunches shall be cut from 356 x 127 x 33 UB
2. Base plates shall be 750 x 750 x 25 mm thick
3. Holding down bolts shall be 4 x 20 mm diameter x 450 mm long at each base.
Buy Custom Answer of This Assessment & Raise Your Grades
If you are looking to do my assignment for me on BPM209: Cost Management for C&S Works then you should take help from Singapore Assignment Help. we have experienced writers who have years of experience to prepare faultless solutions for project management assignments and accounting assignments at an affordable cost.
Looking for Plagiarism free Answers for your college/ university Assignments.
- RBP020L056 A Strategic Management Assignment Report: External & Internal Analysis with Strategic Options for Business Growth
- Capital Budgeting Assignment Report: PIONG Corporation Case Study on Risk & Investment Analysis
- BCAF003 Business Accounting Assignment : Temasek Polytechnic Case Study on Transactions, Equity & Trial Balance
- 304SE Energy Systems Assignment: Boiler Efficiency & 3-Bus Power Flow Case Study with Carbon Emission Analysis
- SM9532 International Expansion Strategy Assignment Report: CAGE, PND & AAA Analysis for Global Market Entry
- PSB6023CL Strategy and International Business Simulation Assignment Report: Automotive Case Study on Strategic Decision-Making and Performance Review
- ESG in Maritime Industry Assignment : Literature Review on Environmental, Social and Governance Practices
- CVE2332 Seepage and Flownet Analysis Assignment : Singapore River Cofferdam Case Study for Cost-Effective Sheet Pile Design
- DSWSH MC2 Electronic Security Assignment: Protection in Depth Plan for American International School (AIS) Singapore
- 6WBS0035/6 Digital Strategy Presentation Assignment: MNC Innovation Proposal for Global Growth