| University | Singapore University of Social Science (SUSS) |
| Subject | BPM109: Contract Administration |
Question 1
Discuss why the contract sum in a particular construction project must be continually updated during the contract period.
Question 2
The following Instructions (a), (b), (c) and (d) are given by a contract administrator during a contract period. Based on the SIA Lump Sum contract and the cost information given in the table, apply the rules of variation and calculate the variation costs. Page No Description Unit Rate B3/23/B 20 mm thick cement and sand (1:3) paving trowelled smooth. B3/45/A 16 mm thick ‘Celetone’ mineral fibre board suspended ceiling. B3/48/C 900 x 2100 x 45 mm thick single leaf half-hour fire-rated door. m2 $13.00 m2 $ 25.00 No $7.80
(a) Increase the thickness of the cement and sand paving in item B3/23/B to 25 mm thick. 2 The cement and sand paving area is 125 m .
(b) Supply and install 16mm thick ‘Celetone’ mineral fibre board suspended ceiling to two additional meeting rooms. The quantity of item B3/45/A is increased from 22 1248 m to 1425 m
. (c) Supply and install a half-hour fire-rated door to the 2nd storey conference room. The quantity for item B3/48/C is increased from 10 Nos. to 11 Nos. The contractor has mistakenly priced the unit rate for this item at $7.80 instead of $780 per door. The contractor wishes to claim for a correction to this rate.
(d) Supply and fix wrot teak architrave (not shown in the contract documents) to all timber flush doors. Question 3 (40 marks) A well-known University intends to engage a contractor to build a $100 million facility within its campus.
You are required to provide sound professional advice to the Dean of the University. Assume the Public Sector Standard Conditions of Contract 2020 is used for the contract, explain the payment procedure from the commencement of the contract to the issue of the Final Certificate.
Buy Custom Answer of This Assessment & Raise Your Grades
Are you facing difficulty in BPM109: Contract Administration and want someone to give my assignment help then you have come to the right place. At Singapore Assignment Help we have a group of suss assignment writers who provide you impeccable help in business administration assignments at a low-cost price.
Looking for Plagiarism free Answers for your college/ university Assignments.
- MGT304 Business Consultancy Project Assessment Brief 2026 | MDIS
- MGT303 Leading and Implementing Organisational Change Assessment Brief 2026
- HR9534 Resourcing and Development for Diversity Assessment Brief 2026
- MK9531 Content and Communications Marketing Assessment Brief 2026
- PSB6062MP Advanced Concepts in Media Studies Assignment Brief 2026
- PSB601EN Systems Operation and Control Project PT Coursework 1 Brief 2026
- SST102 Human Factors and Systems Design Group-based Assignment 2026
- SWK356 Social Work in Healthcare Tutor-Marked Assignment 2026
- ARCH1000 Architectural History and Theory 1 Assignment 1 Brief 2026 | UNSW
- NCO212 The ‘Smart City’ and Society Pre-Class Quiz Assignment 2026 | SUSS