      University Singapore University of Social Science (SUSS)
      Subject BPM101 Interdisciplinary Studies in Construction

      BPM101 Group Case Study 01

      This assignment is worth 14% of the final mark for BPM101 Interdisciplinary Studies in Construction.

      Topic: Case Study to Newton.Gems Condominium

      Singapore construction industry was hit significantly by COVID. The main challenges during post-Covid era faced by the industry are the increase in labour and material costs, and the need to reduce dependence on foreign workers. One of the possible solutions is to adopt concept of design and assembly, with advance precast technologies, which can improve the efficiency and quality of construction projects.

      Project Background (info from BCA)

      Background

      Newton.Gems is a 30-storey residential development with a basement at Newton

      Road/Lincoln Road. This project comprises two identical towers with a total of 190 units.

      BPM101 Interdisciplinary Studies in Construction Group Case Study 01, 2026

      BPM101 Interdisciplinary Studies in Construction Group Case Study 01, 2026
      Site Location

      Project Team 

      Owner: Great Eastern Life Assurance Pte Ltd Main Contractor (D&B): Shimizu Corporation Architect: Architects 61 Pte Ltd

      Structural Engineer: Meinhardt (Singapore) Pte Ltd M&E Engineer: Squire Mech (Pte) Ltd Precast Supplier: Fermold Pte Ltd

      Project Data

      Contract Sum: $61.8 million Contract Period: 26 months Site Area: 9754.10 m2

      Total GFA: 28,818.97 m2

      Building Height: 120 m

      Challenges Faced

      The site was bounded by private residential buildings and next to the Royal Hotel. The proposed building is rectilinear with length to width ratio of about 4 and has an aspect ratio (that is height/width ratio) of 8.15. Narrowest and widest section of the building itself measured about 6m and 14m respectively at the typical floor. Apart from the intricate design of such a slender building, the site constraints posed many challenges to the project team. They were: –

      BPM101 Interdisciplinary Studies in Construction Group Case Study 01, 2026
      Slender elevation of the building

      Limited site access

      The site had highly restricted access, with only a narrow 6m to 8m wide clear path available on two sides of the building. Coupled with ongoing basement construction activities, the availability of access was at times limited to just one side for delivery of precast panels and the movement of other heavy vehicles, such as ready-mix trucks

      BPM101 Interdisciplinary Studies in Construction Group Case Study 01, 2026
      Limited site access for panel delivery Potential environmental disturbance to local communities

       Being “sandwiched” between nearby residential units and a hotel, there was environmental impact consideration such as noise and dust. Conventional metal formwork system would generate relatively high noise level during installation, casting of in-situ concrete and formwork removal. This could lead to restrictions on working hours, potentially impacting the project’s progress.

      Design Concept and Considerations 

      To address the site constraints and design complexities, the team worked together to achieve an optimal combination of precast concrete components with cast in-situ elements. Maximum prefabrication off-site was intended to minimize the need for extensive working space onsite. The adoption of precast façade and appropriate joint details had enabled the installation of precast panels to be done from the interior of the building, eliminating the need to have external scaffolding.

      With less wet trades and debris generated due to prefabrication, critical access routes remained clear. Additionally, the noise generated during the installation of precast panels was generally within acceptable limits, helping to minimize disturbances to neighbouring residents and hotel occupants.

      BPM101 Interdisciplinary Studies in Construction Group Case Study 01, 2026

      External scaffolding is not required for full precast façades

      BPM101 Interdisciplinary Studies in Construction Group Case Study 01, 2026
      Floor layout showing the different precast concrete components used

      Cast in-situ columns and shear walls were designed and located on the interior of building for structural stability. Such stability was further enhanced using coupled shear walls via coupling beams to transfer shear. Precast load-bearing elements including columns, shear walls, and staircase cores were adopted to form the building envelope supporting structures. Other vertical components such as precast lift core walls, household shelters, and precast refuse chutes were used.

      BPM101 Interdisciplinary Studies in Construction Group Case Study 01, 2026

      BPM101 Interdisciplinary Studies in Construction Group Case Study 01, 2026
      Isometric view of precast building components used

      Horizontal Precast Concrete Components 

      Transfer of horizontal floor loads were transferred  using floor beams. These beams served to stiffen horizontal plate for lateral resistance of building. Almost all the horizontal elements were precast; precast beams (including bay window spandrel and coupling beams), precast full slabs and half slabs frames into the columns and walls system. Other horizontal components includes precast balconies, air-con ledges, parapets, sunshades, staircase landings and flights.

      BPM101 Interdisciplinary Studies in Construction Group Case Study 01, 2026
      Precast beams profiled with drop level
      BPM101 Interdisciplinary Studies in Construction Group Case Study 01, 2026
      Non load-bearing window wall integrated with beam to form an enclosed window panel

      Variety of Exterior Face Shapes, Profile and Groove Line Details

      Exterior vertical load bearing elements were profiled with recesses to cater for aluminium curtain walls and windows interface. Likewise, exterior horizontal elements including bay windows spandrels were also profiled for weather protection around the window joints. By using precast system, it would be easier to produce profiled panels to finished dimensions by designing moulds that allows for projecting ledges to be cast with mould face-down.

      Vertically cast methods as necessitated using in-situ construction would be cumbersome, and frequently honeycombing occurs around deeply profiled edges and recesses unless formworks are intricately designed.

      BPM101 Interdisciplinary Studies in Construction Group Case Study 01, 2026
      The fabrication of the precast mould accounts for the blockouts, recesses, groove lines etc. to create the necessary profiles.
      BPM101 Interdisciplinary Studies in Construction Group Case Study 01, 2026
      Deep profiled precast bay windows, sunshading ledges for aesthetic and functional purpose

       

      High Level Roof Trellis with Intertwined Features

      The roof level trellises, or crown structure measured approximately 15m from the roof level. With a narrow floor slab footprintof about 6m, it would have been a daunting task to put up formwork support and bracing system for constructing high level in-situ columns and trellises without external scaffolding system. The team had adopted the use of precast concrete components to overcome this challenge. The whole roof structure was fully prefabricated and erected in a carefully planned sequence.

      BPM101 Interdisciplinary Studies in Construction Group Case Study 01, 2026
      Photo showing part of the crown structure at about 15 m above the building roof level

      The two towers were almost identical, with minor variations at some corners of a few floors. Precast panels were designed to stay within the tower crane’s transportable limits and lifting capacity of 12 tons within a 20-meter radius. A total of four tower cranes were used with heaviest components weighing 11.5 tons.

      BPM101 Interdisciplinary Studies in Construction Group Case Study 01, 2026
      Two cranes for each block

      In this project, most of the floor slab elements were precast full slabs so that there would be minimal in-situ concreting works. This method allowed for multiple small work units to be carried out simultaneously within the same floor, as the floor plate was immediately usable as a working platform upon installation. The panel jointing work can be divided into several discrete locations.

      BPM101 Interdisciplinary Studies in Construction Group Case Study 01, 2026
      The mould for the casting of precast full slab. Rebars installed before casting
      BPM101 Interdisciplinary Studies in Construction Group Case Study 01, 2026
      Casting of pour strip after installation of precast floor slab               

      The installation of precast components adhered to the conventional workflow: vertical elements were installed and propped, followed by horizontal elements installation. Except for some non-structural elements, most components are connected through wet joints to ensure water tightness. Precast works precede in-situ works to allow interfacing sections to be cast together with the in-situ concrete.

      For M&E services, conduits and cast in items such as socket outlets were incorporated into the panels. Services connections were provided for in the false ceiling space. This approach eliminated the need for cast-in conduits within the precast full slabs, avoiding potential damage to conduits caused by drilling during the anchoring of props for vertical panel installation.

      Overall, the project team had successfully integrated the use of prefabrication with cast insitu construction. Good design co-ordination, construction method and site management from the conceptual stage had enabled them to realise the full benefits of precast works.

      BPM101 Interdisciplinary Studies in Construction Group Case Study 01, 2026

      Try to write up a group study with no more than 3000 words, focusing on the below:

      Task 1

      Describe the Industry Transformation Map (ITM) for the built environment in Singapore, including its main objectives and the aspects in Design, Construction and Operations & Maintenance stages. Provide examples to demonstrate how the construction sector becomes more progressive, efficient, and professional by aligning with the ITM strategies.

      (15 marks)

      get customised support for your bpm101 interdisciplinary construction case study

      Native Singapore Writers Team

      • 100% Plagiarism-Free Essay
      • Highest Satisfaction Rate
      • Free Revision
      • On-Time Delivery

      Get Help By Expert

      Trying to show how Singapore’s construction sector can become more progressive, efficient and professional in your bpm101 interdisciplinary studies in construction group case study? Our business process management assignment help can provide subject-specific academic support for the ITM task. You can also explore a suss assignment sample to review our approach. Students needing assignment helper singapore can get a customised case-study response connecting ITM strategies with design, construction and operations examples from the built environment.

      Do you need a fresh written answer for this question?

      100% human-written, Turnitin + Originality.ai checked — delivered before your deadline.

      Request Answer →

      Author Bio

      Laura Tan
      Laura Tan

      I am an academic writer since 2003 and associated with Singapore Assignment Help. I have expertise in making dissertation proposal. Till now i helped more than 2000 Singaporean and Malaysian Students in completing their masters dissertations thesis and other academic papers.

      It's your first order?

      Use discount code SAH15 and get 15% off

      Need this question answered?