Assignment Details:
Question 1
Identify and explain the SMM rules required for measuring trench excavation associated with the laying of sewerage pipes. Your answer should include the information to be given, general description and measurement rules.
(10 marks)
Question 2
Interpret Figures Q2.1 to Figure Q2.4 and apply measurement techniques to take off quantities of the Inspection Chambers (IC 1 & 2) for the following works:
(a) Excavation and concrete work; and
(15 marks)
(b) Brick walls, rendering, precast slab and associated works
(15 marks)
(c) Drainage work between ICs 1 and 2
(15 marks)
Specifications:
(i) There is one 100mm diameter half round branch drain channel connected to each Inspection Chamber.
(ii) Bricks shall be in common bricks, laid English Bond, bedded and jointed in cement and sand mortar.
(iii) Vitrified clay channels shall be bedded and jointed in cement and sand mortar (1:3).
(iv) Concrete benching shall be in mass concrete grade 25.
(v) Main drain line shall be 150mm diameter cast iron pipe.
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
Native Singapore Writers Team
- 100% Plagiarism-Free Essay
- Highest Satisfaction Rate
- Free Revision
- On-Time Delivery
Question 3
(a) Identify and explain the general rules, description and specific SMM rules required for measuring reinforcement bars.
(10 marks)
(b) Interpret Figures Q3.1 and Figure Q3.2 and apply measurement techniques to take off quantities for the steel reinforcement in concrete beam.
(15 marks)
Specifications:
(i) Column size is 300x300mm and concrete cover is 25mm thick
(ii) Bend allowance is 200mm
(iii) Lap allowance for bars is 300mm and hook allowance is 24 times diameter of bar
Question 4
With reference to Figure Q4:
(a) Identify and explain the specific SMM rules (Measurement Rules only) for measuring steel portal frame.
(10 marks)
(b) Apply measurement technique to prepare a take-off list including the unit of measurement for the steel portal frame.
(10 marks)
Buy Custom Answer of This Assessment & Raise Your Grades
SingaporeAssignmentHelp.com has the best experts that offers a great construction law assignment writings for all the students pursuing their degree program in the field. Come to us and grab the best creative writing services online at low price.
Looking for Plagiarism free Answers for your college/ university Assignments.
- A2429C Case Study Assignment: Glucose Homeostasis, Muscle Function, and Cardiovascular-Lymphatic Disorders
- Finance/ Wealth Management Assignment: Broker Report on Equity and Bond Valuation for Global Listed Companies
- PSB503IT Team Project Reflective Report Assignment: Enhancing Collaboration and Professional Development
- Microbiology Assignment: The Role of Medical Microbiologists in Disease Control and Their Contribution to Public Health
- A2389C Pharmaceutical Supply Chain Case Study Assignment: Emergency Preparedness Plan for Tariff Impact in Singapore
- Mobile Learning App Evaluation Report Assignment: Usability, Design, and Learning Outcome Analysis
- CTA Psychotherapy Intervention Essay Assignment: Sheila Case Study on Managing Anxiety and Marital Stress
- DSM500 Machine Learning Project Proposal: Retail Sales Forecasting with Time Series Models
- Project Management Assignment 2: The Shard UK Case Study on Risk & Stakeholder Strategies in Construction Projects
- CSIT121 Banking Application Assignment: OOP-Based Customer & Account Management System in Python