BPM109: Discuss why the contract sum in a particular construction project must be continually updated during the contract period: Contract Administration Assignment, SUSS, Singapore

Updated: 4 May 2026 Free Assignment Question
Table of Contents

    Need a Custom-Written Answer for This Question?

    Our Singapore-based academic experts write 100% original, Turnitin + Originality.ai checked answers — delivered within your deadline.

    Request Plagiarism-Free Answer

    🔒 100% confidential · No data stored

    Get a 100% Human-Written Answer (AI-Free) Free quote in 10 minutes · 100% confidential
      University Singapore University of Social Science (SUSS)
      Subject BPM109: Contract Administration

      Question 1

      Discuss why the contract sum in a particular construction project must be continually updated during the contract period.

      Question 2

      The following Instructions (a), (b), (c) and (d) are given by a contract administrator during a contract period. Based on the SIA Lump Sum contract and the cost information given in the table, apply the rules of variation and calculate the variation costs. Page No Description Unit Rate B3/23/B 20 mm thick cement and sand (1:3) paving trowelled smooth. B3/45/A 16 mm thick ‘Celetone’ mineral fibre board suspended ceiling. B3/48/C 900 x 2100 x 45 mm thick single leaf half-hour fire-rated door. m2 $13.00 m2 $ 25.00 No $7.80

      (a) Increase the thickness of the cement and sand paving in item B3/23/B to 25 mm thick. 2 The cement and sand paving area is 125 m .

      (b) Supply and install 16mm thick ‘Celetone’ mineral fibre board suspended ceiling to two additional meeting rooms. The quantity of item B3/45/A is increased from 22 1248 m to 1425 m

      . (c) Supply and install a half-hour fire-rated door to the 2nd storey conference room. The quantity for item B3/48/C is increased from 10 Nos. to 11 Nos. The contractor has mistakenly priced the unit rate for this item at $7.80 instead of $780 per door. The contractor wishes to claim for a correction to this rate.

      (d) Supply and fix wrot teak architrave (not shown in the contract documents) to all timber flush doors. Question 3 (40 marks) A well-known University intends to engage a contractor to build a $100 million facility within its campus.

      You are required to provide sound professional advice to the Dean of the University. Assume the Public Sector Standard Conditions of Contract 2020 is used for the contract, explain the payment procedure from the commencement of the contract to the issue of the Final Certificate.

      Buy Custom Answer of This Assessment & Raise Your Grades

      Get Help By Expert

      Are you facing difficulty in BPM109: Contract Administration and want someone to give my assignment help then you have come to the right place. At Singapore Assignment Help we have a group of suss assignment writers who provide you impeccable help in business administration assignments at a low-cost price.

      Do you need a fresh written answer for this question?

      100% human-written, Turnitin + Originality.ai checked — delivered before your deadline.

      Request Answer →

      Author Bio

      Laura Tan
      Laura Tan

      I am an academic writer since 2003 and associated with Singapore Assignment Help. I have expertise in making dissertation proposal. Till now i helped more than 2000 Singaporean and Malaysian Students in completing their masters dissertations thesis and other academic papers.

      It's your first order?

      Use discount code SAH15 and get 15% off

      Need this question answered?