University | Singapore Institute of Technology (SIT) |
Subject | MME2121: Engineering Dynamics |
1. Non-linear pendulum equation
To solve the non-linear ODE:
d²θ/dt² + g/l sinθ = 0
with initial conditions:
θ(0)=θο=0.2 rad; θ^º(0) = 0 rad/s
Let the length l = 9.81 m and g = 9.81 m/s2
- Define the two states for the equation
- Use ode45 to solve the equation for θ and dθ/dt or (𝜃𝜃̇) with respect to time for
the initial angular displacements are given below. In all three cases, the initial
angular velocity is 0 rad/s θο = 7.5°; θο = 30°; and θο =45°;
Buy Custom Answer of This Assessment & Raise Your Grades
2. Linear pendulum equation. Use ode45 to solve the linearized equation given in A: d²θ/dt² + g/lθ = 0
For the same initial conditions as A. Compare and comment on the results from the two problems.
Check your understanding by comparing sin(θ0) with θ0 i.e. at what angle will the solution of (A) and (B) differ by more than 10%? Note that θ0 must be expressed in radians,
3. A training model of an overhead gantry crane is shown in Figure 2. The trolley has a mass M = 20 kg. The position of the center of mass O’ of the trolley is x(t) from a fixed reference point O. A horizontal force f(t) is used to control the x movement of the trolley. A load of mass m = 2 kg is attached by a cable length l = 2 m to O’. The angle θ of the load cable from a vertical line is as shown, positive counterclockwise.
Figure 2
- Draw the FBD and KD for the trolley and the load. Let T represent the tension in the cable. State any necessary assumptions that you need to make.
- If your FBD and KD are correct, you should get for θ sufficiently small, a (linearised) simplified equation:
- The force to the trolley is f(t)=(A/wo²)•cos(2πt/to), where A is the maximum displacement of the trolley, wo=2π/to, and to is the period of the trolley motion.
Use Matlab ode45 to solve for the motion of θ in (1) And separately plot θ ( t ) and θ(t ) versus time for A = 2 and to = 1 second.
- The motion of the trolley is coupled to the motion of load by another ODE:
Try to solve (1) and (2) together.
Are you willing to score top-notch grades in (MME2121) Engineering Dynamics at the Singapore Institute of Technology (SIT)? Then you have a great chance to improve your grades surprisingly. Buy engineering assignment help services from Singapore Assignment Help at a very low cost. These cost-effective and wonderful services are offered by expert homework helpers who have extensive knowledge of engineering dynamics theories and concepts.
Looking for Plagiarism free Answers for your college/ university Assignments.
- Engaging Youth with IBM Skills Build Assignment: Designing Innovative Strategies for Skill Development and Career Growth
- BUS368 Innovation Management and Digital Transformation Assignment: Managing Innovation in Foldable, Trifold, and Stretchable Display Technologies
- BUS366 Assignment: Process Improvement and Recruitment Optimization Using Lean Six Sigma Methodology
- HBC203 Statistics and Data Analysis for the Social and Behavioural Sciences TMA-01: A Comparative Analysis of Workplace Wellbeing Interventions and Their Impact on Employee Productivity
- BCAF003 Business Accounting Assignment: A Comprehensive Study on Bank Reconciliation, Cash Controls, Inventory Valuation, and Financial Analysis
- MGT201 Managing Self and Others Assignment: Exploring Generational Challenges and Leadership Styles to Enhance Wellbeing Using the PERMA Model
- EBM3005 Energy Management and Audit Assignment: Energy Performance Evaluation of a Water-Cooled Central Chilled Water Plant and Air Distribution System Using Live Audit and BMS Data
- HRM331 Talent Management Assignment: Strategic Prioritization of Employee Engagement Areas to Retain Gen Z Talent at Innova Code
- BUS357 Starting and Managing a Business Assignment: Business Feasibility Assessment Report for “Travel With Host” – A Personalised Travel Platform
- Communication Studies Individual Assignment: Professional Job Application in Response to a Real-World Job Advertisement