University | Singapore Polytechnic (SP) |
Subject | BIM- Biudling Information Modeling Report |
4.1. Integrating different components of an infrastructure in a model
Lab 1 introduced how architectural models can be prepared and reported in using BIM.
In the subsequent labs, you have learnt how to design MEP, undertake structure analysis, estimate cost and prepare BIM for energy simulation of infrastructures.
You need to employ those skills and create a model that includes all the aspects mentioned above.
4.2. Report Clients or parties involved in various aspects of a building often require a report summarising the model and planning the model process.
Write a brief BIM execution plan for a specific part of the project including project BIM Uses, working procedure and BIM tools and a report analysing existing spaces and their capacity using the model you have designed.
Buy Custom Answer of This Assessment & Raise Your Grades
Argue how the MEP you have designed addresses the demands of the spaces Provide a summary of structural integrity of the buildings by highlighting the role of BIM.
Provide an estimate of the construction cost for the building.
Make the model ready for energy simulation.
Make sure you to use appropriate visualisations of the model to support the report. At the end discuss how you have ensured consistency between all different aspects of the building.
- Assessment criteria
- Demonstrated understanding of different aspect (design/ MEP/ structure/energy/construction) of infrastructures
- Demonstrated ability to develop a consistent 3D model including the above aspects
- Demonstrated ability to use BIM for analysing the design/MEP/structure/energy/construction aspect of an infrastructure
- Demonstrated ability to critically examine and plan for information creation and usage in the different aspects of infrastructure.
Stuck with a lot of homework assignments and feeling stressed ? Take professional academic assistance & Get 100% Plagiarism free papers
Singaporean students dealing with the BIM - Building Information Modeling Report at SP now have access to specialized assistance through our platform. We cater to individual assignments and offer a dedicated assignment writing service in Singapore, focusing on Case Study Assignment Help In Singapore. Whether it's composing a BIM execution plan or understanding project BIM Uses, our experts provide tailored guidance. By engaging and paying our experts, students can effectively navigate their coursework, ensuring success in their BIM studies at Singapore Polytechnic.
Looking for Plagiarism free Answers for your college/ university Assignments.
- ECE210 Advocacy and Collaborations with Families Assignment: Supporting Young Children Through Grief and Family-Centered Partnerships
- ACC707 Accounting and Finance Assignment: Evaluating Investment Decisions, Budgeting Strategies, and Financial Performance Analysis
- NCO201 Learn to Learn, Learn for Life TMA-01: Developing Self-Directed Learning Through the Journey of Mastering Public Speaking
- PSS219 Public Safety and Security in Singapore Group-Based Assignment: Strengthening National Resilience Through Policy Responses from the 2025 Committee of Supply Debate
- MTH240 Engineering Mathematics I Assignment: Heat Transfer, Chemical Balancing, Circuit Analysis, Signal Processing, and Matrix Theory
- Engaging Youth with IBM Skills Build Assignment: Designing Innovative Strategies for Skill Development and Career Growth
- BUS368 Innovation Management and Digital Transformation Assignment: Managing Innovation in Foldable, Trifold, and Stretchable Display Technologies
- BUS366 Assignment: Process Improvement and Recruitment Optimization Using Lean Six Sigma Methodology
- HBC203 Statistics and Data Analysis for the Social and Behavioural Sciences TMA-01: A Comparative Analysis of Workplace Wellbeing Interventions and Their Impact on Employee Productivity
- BCAF003 Business Accounting Assignment: A Comprehensive Study on Bank Reconciliation, Cash Controls, Inventory Valuation, and Financial Analysis