FMT302 Operation and Maintenance of Building Services TMA 2 – SUSS- Formation and operation of the Facilities Management (FM), Singapore

Updated: 18 Feb 2019 Free Assignment Question
Table of Contents

    Need a Custom-Written Answer for This Question?

    Our Singapore-based academic experts write 100% original, Turnitin + Originality.ai checked answers — delivered within your deadline.

    Request Plagiarism-Free Answer

    🔒 100% confidential · No data stored

    Get a 100% Human-Written Answer (AI-Free) Free quote in 10 minutes · 100% confidential

      Assignment Details:

      Question 1
      A tertiary institution with multi-campus was first built in 2000. The campus facilities systems are of age and system records are poor managed. Formation and operation of the Facilities Management (FM) Unit was first set up in year 2000. The FM Unit consist of in-house staff, example: management staff, engineer, technician and handy man levels providing facilities support to the University. Outsourcing is only limited to major upgrading A & A projects and
      repair of specialized equipment.

      Through the years, it underwent a few building alterations, minor modifications, new installation and removals of equipment. But these works were being executed by different vendors / contractors and in phases. Hence, were not properly be documented.

      Hire a Professional Essay & Assignment Writer for completing your Academic Assessments

      Native Singapore Writers Team

      • 100% Plagiarism-Free Essay
      • Highest Satisfaction Rate
      • Free Revision
      • On-Time Delivery

      Currently, the FM Unit maintenance practises only conduct scheduled and preventive maintenance for plant, equipment and services that need to satisfy definite regulatory control. Over the years, the Facilities Management records are not comprehensive. Furthermore, any action initiated by the clients or users outside of the Service Call Centre’s hotline will not be reflected in the fault report system.

      The existing building operational personnel also require to manually perform and record all the hundred electricity meters and water meters in the campus and forwarded the meter readings to the Account division for generating the utilities billing. Furthermore, the majority of the facilities are connected to the BMS system but the system operations are relied on manual controls.

      The FM Unit has appointed you as the Facilities Director. Your first task is to study and improve the FM organisation structure and use the technology for effective FM M&E service delivery.

      Read the case thoroughly and analyse the following areas which will support the FM structure and maintenance management functions.

      (a) Compare and contrast the In-house, outsourced, hybrid FM, and other MA model to improve the FM structure and model with real life examples;  (25 marks)
      (b) Examine the FM organisation chart and review the relationship of FM Unit with the outsourced services;  (15 marks)
      (c) Propose technology based for smart facilities management in the campus, significant benefits and achievement in effective FM operations and service delivery;  (30 marks)
      (d) Propose strategies to improve the M&E maintenance regime and Data /documentation management system.  (30 marks)
      In this project, the objectives of the building maintenance and management setup should:
      (i) Improve costs efficiency
      (ii) Improve operational efficiency
      (iii) Support multi-campus competitiveness
      (iv) Provide superior customer service capability and quality
      (v) Elimination of paper work and circulation process

      Get Help By Expert

      SingaporeAssignmentHelp.com delivers marvelous construction management homework writings for the students studying in various Singaporean universities. Our writers are proficient in completing great academic writing such as essay help, case study writings, report paper help, etc.

      Do you need a fresh written answer for this question?

      100% human-written, Turnitin + Originality.ai checked — delivered before your deadline.

      Request Answer →

      Author Bio

      Laura Tan
      Laura Tan

      I am an academic writer since 2003 and associated with Singapore Assignment Help. I have expertise in making dissertation proposal. Till now i helped more than 2000 Singaporean and Malaysian Students in completing their masters dissertations thesis and other academic papers.

      It's your first order?

      Use discount code SAH15 and get 15% off

      Need this question answered?