University | Singapore Institute of Technology (SIT) |
Subject | CVE2322: Civil Engineering Materials |
1. General Assignment Information
Assignment Value: | 30% |
Submission Type: | Group work with INDIVIDUAL submission |
Submission Method: | Video (.mp4) of your model and PDF file uploaded to xSITe |
Due Date: | Week 8 (23 June 2025, Monday) – Model video Week 10 (11 July 2025, Friday) – Project reflection report on xSITe |
Result/type: | Letter Grade. |
2. Assignment Requirements
In this exercise, you will work in your team (maximum 5 persons) to design, construct and film a model GANTRY made of reclaimed materials that can be recycled after the project. The GANTRY should be able to support a container filled with 500 ml of water. You will decide on the structural form of the gantry and the detail and type of structural members and connections.
Make use of your knowledge of civil engineering materials (Lecture 1 and Lecture 2) and Statics and Structure Mechanics when conceptualising your model. Document your individual personal reflections of the conceptualisation, build experience, and group video presentation session in a two page report to be submitted in Week 10. Students may wish to highlight some key learning points related to civil engineering material properties and showcase sustainable development concepts in your report.
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
Native Singapore Writers Team
- 100% Plagiarism-Free Essay
- Highest Satisfaction Rate
- Free Revision
- On-Time Delivery
Students may engage in a friendly competition for:
- The most recyclable and longest span i.e. longest horizontal distance between base supports, and;
- The most impressive video.
Some pointers to note:
- 3R principles must be adhered to.
- Teamwork is important.
- Model gantry should take you no more than 2 hours to construct and film.
- Fastening methods may include glue, strings, tape or other relevant materials.
- The gantry base(s) must fit within a total area of one sheet of A4 paper.
- The tower must be free standing and not secured to the ground nor external supports.
- Video should show the entire gantry and be no more than 60 seconds.
- Note a Reflection Report is NOT a Project Report.
- Generative AI (gAI) tools permitted and encouraged if used responsibly and ethically. NOTE: punitive penalties will be applied for abuse of gAI e.g. if your report is inconsistent with your video submission.
Buy Custom Answer of This Assessment & Raise Your Grades
Are you unable to create the CVE2322 Gantry Build Prototype Assignment report? Don't worry, you can avail report writing services at Singapore Assignment Help at cheap prices and achieve high grades in your academic year with 100% original content.
Looking for Plagiarism free Answers for your college/ university Assignments.
- EGH222 Healthcare Analytics Assignment 2: Predictive Model for Sick Days Based on Employee Demographics and Lifestyle Data
- Sustainability Strategy Assignment: Selected Company Case Study on Addressing Sector Challenges and Driving Behavioural Change Campaigns
- 7WBS2012 Executive Career Development Assignment: Career Pathway & Readiness Post-MBA in Education Management
- BMG706 Strategic Quality Change Assignment Report: Enhancing Operational Excellence at any Organization
- CVE2323 Structural Analysis Assignment: Matrix Method & STAAD.Pro Evaluation of Frame Systems
- BMK3015 Major Project Assignment: Customer-Centric Design Solutions Using Research & Project Management
- Wellbeing Assignment: University Students’ Perspectives for Improving Mental Health Support
- BCLO001 Business Statistics Assignment: Analysis of Exercise Duration Among Singaporean Students
- BM4364 Customer Experience Assignment: Evaluating CX Practices Through Employee Insights in the Service Industry
- GSFM7514 Accounting & Finance Assignment: SAC Services & MEMC Budgeting and CCID Investment Evaluation