Project Management Assignment 2: The Shard UK Case Study on Risk & Stakeholder Strategies in Construction Projects, Singapore

University Singapore Institute of Technology
Subject Project Management

Assessment 2: Case Study Analysis

This is an individual undertaking and needs to be completed by Monday, 19th May 2025, 2359 SGT.

You are required to choose from the following project case studies, all of which are relatively well documented online and in textbooks. Note that some are great successes, some are terrible failures and some could be argued either way depending on your perspective. All are well documented but do make sure you focus on the way project management processes were (or were not) followed and do not use up large word count on engineering or technical descriptions as this is not an engineering module:

  • Space Shuttle Challenger testing and launch
  • Crossrail implementation on London’s tube network
  • The Shard UK design and build
  • Boeing 787 development
  • The Thames Tideway Upgrading London’s Sewer System

Your job for this assignment is to analyse and critique the success or failure of the project specifically in terms of its project management capability and to tell us what you have learned from this. For example, Burj Khalifa was an engineering success story but, as a project, can it, and should it, be seen as successful?

In this particular case how does it compare to ‘The Shard’ in its approach to development and construction techniques. Do not get distracted by detail of the engineering processes or technical design. These may be important but your focus MUST be on the application of the project management process throughout the project’s lifecycle. Specifically, analyse the case’s approach to risk management and stakeholder management. You will draw on the perspectives of project management best practice and academic literature and demonstrate your understanding of how the case does or does not reflect this best practice.

Hire a Professional Essay & Assignment Writer for completing your Academic Assessments

Native Singapore Writers Team

  • 100% Plagiarism-Free Essay
  • Highest Satisfaction Rate
  • Free Revision
  • On-Time Delivery

The tasks and marking criteria are as follows:

1. Discuss and critique the project team’s approach to the management of project risk (20%)

2. Analyse the approach to stakeholder management (20%)

3. Decide to what extent you believe the project (or some aspects of it) should be seen as a success. Critique and compare your view with that of others (media, investors, employees, etc.) and justify your position. Having reviewed risk management, stakeholder management and the success or failure of the project what lessons can be learned. (25%)

4. From above (and wider projects investigations in a similar field) what can you offer to help the profession of project management in their applied application to projects? Specifically, if you were writing an article for the Association of Project Managers what would you highlight to the readers to help them in their careers and to do their own jobs better? (25%).

Note this is separate from section 3 above.

5. Overall quality of writing, presentation and academic standards (referencing syntax, etc.). (10%)

This is an individual report and should be approximately 3,500 words, not including references, diagrams, tables, appendices and headings.

To help you, the following is a suggested template structure for your report although this is not prescriptive and you are free to use a different structure if you prefer:

  • Title Page
  • Abstract
  • Table of Contents
  • Brief Introduction to the Project – what, why, where and when
  • Risk Management – approach to project risk management, major risks to project success, how specific risks were dealt with, etc.
  • Stakeholder Management – who were the major stakeholders, why important, how were they managed?
  • Success Review – in what way was the project a success or failure – justify from multiple perspectives. What you learned from the project you are reviewing. This could be a separate heading Lessons learned?
  • Project Management Professional Application – this is worth 25% of the marks so spend some time on this and demonstrate depth of understanding. (see Below)
  • Final conclusions
  • References
  • Bibliography
  • Appendices (if needed)

Buy Custom Answer of This Assessment & Raise Your Grades

Get Help By Expert

Are you trying to find a solution for the Project Management Assignment? You're in the right place. Our platform provides Best Assignment Writing Singapore Help. We have talented writers who can provide assignments with no plagiarism and 100% original content. No doubt! We also provide free assignment writing samples for your guidance. Get in touch right now!

Answer

Looking for Plagiarism free Answers for your college/ university Assignments.

Ask Your Homework Today!

We have over 1000 academic writers ready and waiting to help you achieve academic success