Assignment 1
Biological Nitrogen Removal
- Wastewater contains 40 mg/l of nitrate nitrogen (177 mg/l as Nitrate) and has a flowrate of 10,000 m3/d. Effluent requirements have been set at 2 mg/l total nitrogen. Using a mean cell-residence time of 15 d and a mixed-liquor concentration of 1500 mg/l, determine the volume of a complete-mix reactor that will be required to provide the necessary treatment. Also determine the rate of cell production and the methanol utilization rate, assuming that the influent DO is equal to 5 mg/l. Assume that the final clarifier will produce an effluent with 10 mg/l suspended solids.
Kinetic coefficients:
mm=0.3 d-1
Ks=0.1 NO3–-N mg/l
Y=0.8 NO3–-N, mgVSS/mg
Kd=0.04 d-1
Stuck with a lot of homework assignments and feeling stressed ? Take professional academic assistance & Get 100% Plagiarism free papers
2. Design an aerobic-anoxic process for nitrification/denitrification of wastewater. After preliminary treatment, 20,000 m3/d of wastewater containing 150 mg/l of BOD5 and 30 mg/l of ammonia nitrogen is to be treated. The following conditions are to be used in the design:
Denitrification rate = 0.1 mgNO3–-N/mgVSS.d at 20°C
MLVSS = 3,500 mg/l
Calculate the anoxic volume requirement for denitrifcation and the BOD removal in the anoxic and aerobic zones.
3. A wastewater contains 10 mg/l of ammonia nitrogen and no organic carbon. If the plant flowrate is 10,000 m3/d, estimate the methanol requirement and cell production for the complete bacterial assimilation of ammonia.
Students can now buy assignment Singapore services from the professional experts of SingaporeAssignmentHelp.com and save their grades. Our team of masters and Ph.D. writers are proficient in delivering great solutions for your assignment writings.
Looking for Plagiarism free Answers for your college/ university Assignments.
- A2429C Case Study Assignment: Glucose Homeostasis, Muscle Function, and Cardiovascular-Lymphatic Disorders
- Finance/ Wealth Management Assignment: Broker Report on Equity and Bond Valuation for Global Listed Companies
- PSB503IT Team Project Reflective Report Assignment: Enhancing Collaboration and Professional Development
- Microbiology Assignment: The Role of Medical Microbiologists in Disease Control and Their Contribution to Public Health
- A2389C Pharmaceutical Supply Chain Case Study Assignment: Emergency Preparedness Plan for Tariff Impact in Singapore
- Mobile Learning App Evaluation Report Assignment: Usability, Design, and Learning Outcome Analysis
- CTA Psychotherapy Intervention Essay Assignment: Sheila Case Study on Managing Anxiety and Marital Stress
- DSM500 Machine Learning Project Proposal: Retail Sales Forecasting with Time Series Models
- Project Management Assignment 2: The Shard UK Case Study on Risk & Stakeholder Strategies in Construction Projects
- CSIT121 Banking Application Assignment: OOP-Based Customer & Account Management System in Python