Business Project Management Technolite WBS Sample Singapore

Updated: 6 Nov 2026 Free Assignment Sample
Table of Contents

    Need a Fresh, Plagiarism-Free Copy of This Sample?

    Get a custom-written version within your deadline — free quote in 10 minutes.

    Get a Free Quote

    🔒 100% confidential · No data stored

    Get 100% Human-Written Assignment Quote (AI-Free) Free quote in 10 minutes · 100% confidential

    For information and reference only – not to be submitted as your own work.

    This Technolite WBS sample extract shows how a strong answer to the European Business University Business Project Management brief on the Technolite project and a workplace facility proposal can be structured. It is abridged: the Technolite tasks are covered in fuller form, and the facility project is shown in condensed model paragraphs and tables. For the planning method behind it, read our guide on how to write a business project management WBS assignment.

    Planning table

    Brief part Marks Suggested words (if the limit is about 2,500) What markers look for
    Technolite: life cycle stages 10 250 Each stage named, then applied to the software project, not just defined
    Technolite: reasons for failure 10 250 Causes tied to the case, ranked, with a link to prevention
    Technolite: WBS 15 375 Hierarchical, deliverable-based, complete, with numbering and a short rationale
    Facility proposal for the HR director 25 625 Business case, scope, cost, benefits, timeline and a clear recommendation
    Stakeholder identification and analysis 15 375 Primary, secondary and key groups, then a matrix used properly
    Tuckman stages and team support 10 250 Leader actions matched to each stage
    Project closure 8 200 Handover, lessons learned, release of resources, final review
    Risks and preparation 7 175 Common risks, their sources and a response for each

    Word splits above are only a suggestion based on marks. Check your own brief for the exact limits and format.

    Hire a Professional Essay & Assignment Writer for completing your Academic Assessments

    Native Singapore Writers Team

    • 100% Plagiarism-Free Essay
    • Highest Satisfaction Rate
    • Free Revision
    • On-Time Delivery

    Technolite WBS sample: Project 1

    Task 1: Project life cycle stages (10 marks)

    A project life cycle describes the phases a project passes through from idea to closure. The PMBOK Guide treats the life cycle as a series of phases that may be predictive, iterative or adaptive, depending on how much is known at the start (Project Management Institute, 2021). For a client software project such as Technolite, a hybrid approach is sensible: fixed contract milestones for the client, with iterative build cycles inside them.

    Kerzner (2022) describes a typical sequence of initiation, planning, execution, monitoring and control, and closure. The table applies each stage to a software build. All durations and activities are illustrative.

    Stage Purpose What it looks like at Technolite (illustrative)
    Initiation Confirm the need and authorise the project Client workshop, feasibility check, signed project charter naming the sponsor and success measures
    Planning Define scope, time, cost, quality and risk Requirements specification, WBS, release plan, budget baseline, risk register
    Execution Deliver the work Design, coding in two-week sprints, integration, regular demonstrations to the client
    Monitoring and control Compare progress with the baseline and correct it Burn-down tracking, change control board, defect metrics, monthly sponsor report
    Closure Hand over and learn User acceptance testing, deployment, training, support handover, lessons-learned review

    The stages overlap in practice. Monitoring and control runs alongside planning and execution, so I would show it as a continuous activity rather than a single step. Meredith, Mantel and Shafer (2017) make the same point when they note that effort and cost rise through the build and fall sharply near delivery.

    Task 2: Why the project could fail (10 marks)

    Software projects fail more often through management causes than through technical ones. Flyvbjerg and Budzier (2011), studying more than a thousand IT projects, found that a small share of projects suffer extreme cost overruns that average figures hide. A student answer should therefore discuss tail risk and not only typical delays.

    For Technolite, I would argue that the following causes are the most likely, in this order:

    • Unclear or shifting requirements. If the client keeps adding features without a change process, scope creep drains the budget and the schedule.
    • Weak stakeholder engagement. Users who are not consulted early reject the product at acceptance, even if it meets the specification.
    • Unrealistic estimates. Optimistic effort figures for coding and testing leave no contingency.
    • Skills and resource gaps. Losing a lead developer mid-project delays integration.
    • Poor communication and governance. Without a clear sponsor and escalation route, decisions stall.

    Each cause links to a control: a signed scope baseline and change log, a stakeholder plan, estimates with ranges, cross-training, and a steering group that meets on a fixed rhythm. Showing the cause and its control together earns more marks than a bare list.

    Task 3: Work breakdown structure (15 marks)

    A WBS breaks the total scope into smaller deliverables until each element can be estimated and owned. The PMBOK approach is to decompose by deliverable rather than by activity, so that nothing outside the scope appears and nothing inside it is missed (Project Management Institute, 2021). A common rule of thumb is that the lowest level, the work package, should be small enough to estimate and assign to one person or team. The WBS below is a Level 1 to Level 3 extract and is illustrative.

    WBS code Element Level Example deliverable
    1 Technolite software project 1 Working system accepted by the client
    1.1 Project management 2 Plans and reports
    1.1.1 Charter and plan 3 Approved charter, schedule, budget
    1.1.2 Monitoring and reporting 3 Monthly status reports
    1.2 Requirements and design 2 Signed-off specification
    1.2.1 Requirements gathering 3 User stories and priorities
    1.2.2 System design 3 Architecture and interface designs
    1.3 Development 2 Tested software modules
    1.3.1 Core modules 3 Code, unit tests
    1.3.2 Integration 3 Integrated build
    1.4 Testing and quality 2 Test evidence
    1.4.1 System and security testing 3 Test report, defect log
    1.4.2 User acceptance testing 3 Client acceptance certificate
    1.5 Deployment and handover 2 Live system
    1.5.1 Release and training 3 Deployed system, trained users
    1.5.2 Closure 3 Lessons-learned report

    After the table, add two or three sentences explaining your choices, for example why project management sits as its own branch and why testing is separate from development. Markers reward a short rationale more than a very large diagram.

    Project 2: Workplace facility for an e-commerce firm

    Task 1: Project proposal for the HR director (25 marks)

    Assume the chosen facility is a staff café and relaxation area. The proposal should open with a one-paragraph recommendation: the firm should fund a pilot café space because it supports retention, collaboration and wellbeing at a modest, bounded cost. All numbers below are illustrative, not drawn from the brief.

    Proposal section Content (illustrative)
    Objective Open a staff café within four months, within the approved budget
    Scope Fit-out of one existing floor area, furniture, equipment, a vendor contract; excludes building structural work
    Budget One-off fit-out plus a running-cost allowance, with 10% contingency
    Benefits Higher staff satisfaction scores, lower voluntary turnover, more cross-team contact
    Timeline Approval, design, procurement, fit-out, soft launch, review
    Success measures Usage rates, a pulse survey before and after, and cost per user

    Link the proposal to motivation theory briefly, as the brief concerns workplace motivation. A café meets social and belonging needs, so tie your argument to whichever motivation theory your module uses, and cite a source you have actually read.

    Task 2: Stakeholder identification and analysis (15 marks)

    Mitchell, Agle and Wood (1997) classify stakeholders by power, legitimacy and urgency, which is useful when you must explain why some groups matter more than others. Most project courses also use a power and interest grid, so use whichever matrix your module teaches.

    Stakeholder Type Power Interest Suggested approach
    HR director (sponsor) Key High High Manage closely, weekly updates
    Employees (users) Primary Medium High Consult through surveys and a user panel
    Finance team Primary High Medium Keep satisfied, agree budget controls
    Facilities and building management Secondary Medium Medium Coordinate access, safety, permits
    Catering vendor Secondary Low High Keep informed, contract review
    Neighbouring tenants Secondary Low Low Monitor, notify of noise

    State your classification rule in one sentence: primary stakeholders are directly affected by or directly affect the outcome, and secondary ones are affected indirectly. Then say how the analysis changes the plan, for example by adding an employee panel in the design stage.

    Task 3: Supporting the team through Tuckman’s stages (10 marks)

    Tuckman (1965) proposed four stages of group development: forming, storming, norming and performing. Tuckman and Jensen (1977) added a fifth, adjourning. The table shows the leader’s role at each stage for the facility project team.

    Stage What happens Support I would give
    Forming Members are polite but unsure of roles Clear goals, introductions, defined roles and a team charter
    Storming Conflict over priorities and methods Listen, mediate, agree decision rules, keep focus on the objective
    Norming Shared habits and trust emerge Reinforce good practices, delegate more, set up regular reviews
    Performing The team works effectively Remove blockers, give autonomy, recognise results
    Adjourning The project ends and the team disperses Acknowledge contributions, hold a review, support the next assignments

    Note that teams do not always move in a straight line. A new member or a scope change can send the team back to an earlier stage, and a good answer says so.

    Task 4: Closing the project (8 marks)

    Closure should be planned from the start. Kerzner (2022) stresses formal closure so that benefits are confirmed and learning is captured. For the facility, the arrangements would include:

    • a final inspection and sign-off by the sponsor against the acceptance criteria;
    • handover of keys, warranties, manuals and the vendor contract to facilities management;
    • settlement of invoices and release of unused budget;
    • a lessons-learned session with the team and a user survey after the first month;
    • release of team members back to their roles, with feedback.

    Task 5: Common risks and preparation (7 marks)

    Risk sources can be grouped as internal, external, technical, financial and human. The register below is illustrative and uses a simple high, medium or low rating.

    Risk Source Likelihood Impact Response
    Cost overrun on fit-out Financial Medium High Fixed-price quotes and 10% contingency
    Vendor delay External Medium Medium Penalty clause and a backup supplier
    Low staff uptake Human Medium High Early consultation and a pilot period
    Safety or hygiene non-compliance Regulatory Low High Early inspection and licensed contractors
    Scope creep Internal High Medium Change control with sponsor sign-off

    For each risk, choose a response type: avoid, reduce, transfer or accept, and name an owner. Meredith, Mantel and Shafer (2017) treat risk management as an ongoing process, so mention that the register is reviewed at each stage gate.

    Where to go next

    If you want structured support with similar coursework, see our project management assignment help and report writing help. You can also compare the style of another module in our EBU leadership skills essay brief, browse a project management assignment template, or see every European Business University assignment question. When your own brief is ready, you can submit your assignment details here.

    References

    Flyvbjerg, B. and Budzier, A. (2011) ‘Why your IT project may be riskier than you think’, Harvard Business Review, 89(9). Available at: https://papers.ssrn.com/abstract=2229735 (accessed 6 November 2026).

    Kerzner, H. (2022) Project management: a systems approach to planning, scheduling, and controlling. 13th edn. Hoboken, NJ: John Wiley & Sons. ISBN 978-1-119-80537-3.

    Meredith, J.R., Mantel, S.J. and Shafer, S.M. (2017) Project management: a strategic managerial approach. 10th edn. Hoboken, NJ: John Wiley & Sons.

    Mitchell, R.K., Agle, B.R. and Wood, D.J. (1997) ‘Toward a theory of stakeholder identification and salience: defining the principle of who and what really counts’, Academy of Management Review, 22(4), pp. 853–886. doi:10.5465/amr.1997.9711022105.

    Project Management Institute (2021) A guide to the project management body of knowledge (PMBOK guide) and the standard for project management. 7th edn. Newtown Square, PA: Project Management Institute. ISBN 978-1-62825-664-2.

    Tuckman, B.W. (1965) ‘Developmental sequence in small groups’, Psychological Bulletin, 63(6), pp. 384–399.

    Tuckman, B.W. and Jensen, M.A.C. (1977) ‘Stages of small-group development revisited’, Group & Organization Studies, 2(4), pp. 419–427.

    Prepared by

    Singapore Assignment Help Editorial Team
    Singapore Assignment Help Editorial Team

    This model answer was prepared by our subject desk in response to a real assignment brief we received. It shows one way to approach the task and is meant as a study guide, not for submission.

    It's your first order?

    Use discount code SAH15 and get 15% off

    Need this sample custom-written?